File list
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
04:25, 21 November 2018 | SandGrain.jpg (file) | 47 KB | Cellsworth | 1 | ||
07:54, 19 November 2018 | 2018 Fall HFE Deferral letter 09-14-18.pdf (file) | 647 KB | Cellsworth | Angler's 2018 HFE deferral letter | 1 | |
07:50, 19 November 2018 | Memo - GCMRC response to HFE deferral letter - 9-27-18 (1).pdf (file) | 506 KB | Cellsworth | GCRMC response to HFE deferral request | 1 | |
07:46, 19 November 2018 | Final TechTeamReport Fall 2018 HFE Recommendation.pdf (file) | 378 KB | Cellsworth | Final Recommendation to Implement a Fall 2018 High Flow Experiment at Glen Canyon Dam, November 5-8, 2018 | 1 | |
05:46, 19 November 2018 | 2018HFE lights.jpg (file) | 110 KB | Cellsworth | https://www.usbr.gov/uc/rm/gcdHFE/ | 1 | |
05:34, 19 November 2018 | 2018HFE traveltime.jpg (file) | 252 KB | Cellsworth | https://www.usbr.gov/uc/rm/gcdHFE/ | 1 | |
05:30, 19 November 2018 | 2018HFE.jpg (file) | 214 KB | Cellsworth | https://www.usbr.gov/uc/rm/gcdHFE/ | 1 | |
06:02, 15 November 2018 | USU CCRS.jpg (file) | 11 KB | Cellsworth | 1 | ||
06:19, 26 October 2018 | GCD-Temp Mod-Valdez & Speas 9-17-2013.pdf (file) | 1.82 MB | Cellsworth | Valdez, R.A., D.W. Speas, and D.M. Kubly. 2013. Benefits and risks of temperature modification at Glen Canyon Dam to aquatic resources of the Colorado River in Grand Canyon. U.S. Bureau of Reclamation, Upper Colorado Region, Salt Lake City, UT. | 1 | |
04:05, 12 October 2018 | 2012 Kimbrel PariaRiverRapidResponse Final SK.pdf (file) | 2.48 MB | Cellsworth | 1 | ||
09:12, 28 September 2018 | Blackfly.jpg (file) | 20 KB | Cellsworth | 1 | ||
09:10, 28 September 2018 | Insect leaf.png (file) | 54 KB | Cellsworth | 1 | ||
09:08, 28 September 2018 | Midge.jpg (file) | 12 KB | Cellsworth | 1 | ||
09:01, 28 September 2018 | GammarusLacustris.JPG (file) | 52 KB | Cellsworth | 1 | ||
10:23, 25 September 2018 | 2018zebratail.annualreport.pdf (file) | 5.66 MB | Cellsworth | 1 | ||
06:00, 25 September 2018 | 2015 Valdez Benefits and Risks of Temperature 10062015.pdf (file) | 2.03 MB | Cellsworth | Benefits and Risks of Temperature Modification at Glen Canyon Dam to Fishes of the Colorado River through the Grand Canyon | 1 | |
05:58, 25 September 2018 | 2015 Valdez-Benefits and Risks of Temperature Modification (file) | 2015_Valdez-Benefits_and_Risks_of_Temperature_Modification#3_10-6-2015_(2).pdf | 2.03 MB | Cellsworth | Benefits and Risks of Temperature Modification at Glen Canyon Dam to Fishes of the Colorado River through the Grand Canyon | 1 |
05:52, 25 September 2018 | 2012 LTEMP-DOI Meet-Temp-Valdez (1).pdf (file) | 576 KB | Cellsworth | Benefits and Risks of Temperature Modification at Glen Canyon Dam to Fishes of the Colorado River through the Grand Canyon | 1 | |
05:49, 25 September 2018 | 2015 Valdez-Benefits and Risks of Temperature Modification (file) | 2015_Valdez-Benefits_and_Risks_of_Temperature_Modification#3_10-6-2015_(1).pdf | 2.03 MB | Cellsworth | Benefits and Risks of Temperature Modification at Glen Canyon Dam to Fishes of the Colorado River through the Grand Canyon | 1 |
05:48, 25 September 2018 | 2015 Valdez-Benefits and Risks of Temperature Modification (file) | 2015_Valdez-Benefits_and_Risks_of_Temperature_Modification#3_10-6-2015.pdf | 2.03 MB | Cellsworth | Benefits and Risks of Temperature Modification at Glen Canyon Dam to Fishes of the Colorado River through the Grand Canyon | 1 |
05:44, 25 September 2018 | 2012 LTEMP-DOI Meet-Temp-Valdez.pdf (file) | 576 KB | Cellsworth | Temperature Considerations in the RTCD alternative for LTEMP | 1 | |
10:07, 22 August 2018 | CREDA Brief 2-20-09 FINAL 737pm.pdf (file) | 127 KB | Cellsworth | 1 | ||
04:05, 22 August 2018 | USGS-Logo1.jpg (file) | 69 KB | Cellsworth | 1 | ||
10:51, 3 August 2018 | PotamogetonCrispus.jpg (file) | 381 KB | Cellsworth | 1 | ||
10:46, 3 August 2018 | Egeria densa.jpg (file) | 101 KB | Cellsworth | 1 | ||
10:43, 3 August 2018 | Elodea-hydrilla-egeria.jpg (file) | 59 KB | Cellsworth | 1 | ||
10:37, 3 August 2018 | Elodea canadensis.jpg (file) | 273 KB | Cellsworth | 1 | ||
10:33, 3 August 2018 | Horned pondweed Zannichellia palustris.jpg (file) | 23 KB | Cellsworth | 1 | ||
09:41, 3 August 2018 | Cladophora (1).jpg (file) | 156 KB | Cellsworth | 1 | ||
09:33, 3 August 2018 | Oscillatoria.jpg (file) | 90 KB | Cellsworth | 1 | ||
09:19, 3 August 2018 | Potamogeton pectinatus.jpg (file) | 132 KB | Cellsworth | 1 | ||
09:16, 3 August 2018 | Fontinalis moss.jpg (file) | 73 KB | Cellsworth | 1 | ||
05:06, 3 August 2018 | RZBS lcrmscp.jpg (file) | 133 KB | Cellsworth | 1 | ||
07:35, 23 July 2018 | TCD1.jpg (file) | 47 KB | Cellsworth | 1 | ||
11:16, 19 July 2018 | Turbidity.jpg (file) | 6 KB | Cellsworth | 1 | ||
04:07, 19 July 2018 | HFE Turbidity TMF.jpg (file) | 155 KB | Cellsworth | HFEs Reduce Turbidity after the High Flow https://www.usbr.gov/uc/rm/amp/twg/mtgs/18jan25/AR12.pdf | 1 | |
10:59, 11 July 2018 | USFWS Little Colorado River monitoring - Spring 2018 Trip Report.pdf (file) | 354 KB | Cellsworth | Spring 2018 Monitoring of Humpback Chub (Gila cypha) and other Fishes in the Lower 13.57 km of the Little Colorado River, Arizona Trip Report for: April 17-27, 2018 and May 15-25, 2018 | 1 | |
10:57, 11 July 2018 | HBC Monitoring above Lower Atomizer Falls 2018 Trip Report.pdf (file) | 450 KB | Cellsworth | Spring 2018 Monitoring of Humpback Chub (Gila cypha) and other Fishes above Lower Atomizer Falls in the Little Colorado River, Arizona Trip Report for May 15-24, 2018 | 1 | |
11:47, 10 July 2018 | IMG 8795.JPG (file) | 5.26 MB | Cellsworth | 1 | ||
09:36, 10 July 2018 | Ellsworth TWG Meeting 20180626.pdf (file) | 3.14 MB | Cellsworth | Caddisfly outbreak on the Colorado River below Davis Dam Laughlin NV / Bullhead City AZ | 1 | |
04:23, 6 July 2018 | MLFF hydrograph.jpg (file) | 37 KB | Cellsworth | FIGURE 2-1 Mean, Minimum, and Maximum Daily Flows under MLFF in an 8.23-maf Year Based on Values Presented in Table 2-3 | 1 | |
07:16, 5 July 2018 | MLFF volumes.jpg (file) | 71 KB | Cellsworth | MLFF monthly volumes | 1 | |
04:16, 29 June 2018 | 1956BedElevation.jpg (file) | 84 KB | Cellsworth | http://www.yumaheritage.com/docs/2nd-A-1JackSchmidt_USU_LoganUT.pdf?bcsi_scan_16614fa24ff8c4a5=IaXhBSPIyTlvODi9avNzjRPlDIwJAAAAm7A4CQ==&bcsi_scan_filename=2nd-A-1JackSchmidt_USU_LoganUT.pdf | 1 | |
05:35, 12 June 2018 | GlenCanyonSloughTemperatureOptions FINAL.pdf (file) | 3.07 MB | Cellsworth | Technical Report No. SRH 2018-17 Temperature Reduction Options for Glen Canyon Slough; RM -12 Upper Colorado Regional Office Colorado River, AZ | 1 | |
10:57, 18 May 2018 | Riverrat.jpg (file) | 7 KB | Cellsworth | 1 | ||
06:25, 15 May 2018 | GCWC LTEMP Springtime HFE Comments Feb 24 2016.pdf (file) | 362 KB | Cellsworth | I have sent these GCWC LTEMP comments in response to the TWG discussion in late April, and its request for commentary on issues related to Brown Trout and springtime HFEs. Grand Canyon Wildlands Council commented on the rationale for why springtime HFEs are appropriate, but why they were highly unlikely to occur under the then proposed, and now in effect, LTEMP flood triggering criteria. --Larry Stevens | 1 | |
10:27, 8 May 2018 | 2006SedimentPEP (1).pdf (file) | 97 KB | Cellsworth | 2006 Sediment PEP | 1 | |
09:37, 8 May 2018 | 2005RecreationPEP (1).pdf (file) | 112 KB | Cellsworth | 2005 Recreation PEP | 1 | |
09:36, 8 May 2018 | 2001AquaticPEP (1).pdf (file) | 220 KB | Cellsworth | 2001 Aquatic Foodbase PEP | 1 | |
09:34, 8 May 2018 | 2000CulturalPEP (1).pdf (file) | 137 KB | Cellsworth | 2000 cultural pep | 1 |
First page |
Previous page |
Next page |
Last page |