Difference between revisions of "Library Test"

From Glen Canyon Dam AMP
Jump to: navigation, search
(save)
(save)
Line 60: Line 60:
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
 
|000
 
|000
 +
|AIF: An Overview of Science and Resource Management PPT
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_03.pdf |LINK]
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_03.pdf |LINK]
|AIF: An Overview of Science and Resource Management PPT
+
|  
  
  

Revision as of 16:04, 30 July 2013

  • Revision Date_130729

Number TITLE LINK CATEGORY YEAR FORUM CONTRIBUTOR TBD NOTES
000 AIF: Experimental Action: High Flow Experiment, Preliminary Observations and "2008 High Flow Experiment Update PPT" LINK HFE 2008 AMWG
000 Reporting Schedule for Experimental Studies Associated with the March 2008 High Flow Experiment LINK HFE 2008 AMWG
000 2008 High Flow Experiment, Grand Canyon National Park Observations and Monitoring Results PPT LINK HFE 2008 AMWG
000 Long term Fish Monitoring and Preliminary Results of the 2008 High Flow Electrofishing by the Arizona Game and Fish Department PPT LINK HFE 2008 AMWG
000 Long term Fish Monitoring and Preliminary Results of the 2008 High Flow Electrofishing by the Arizona Game and Fish Department PPT LINK Fish 2008 AMWG


|- style="vertical-align: top; text-align: left;" |000 |AIF: An Overview of Science and Resource Management PPT ||LINK |


|- style="vertical-align: top; text-align: left;" |000 [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_04a.pdf

|- style="vertical-align: top; text-align: left;" |000

	Tamarisk Management and Tributary Restoration (Information Sheet; 

|- style="vertical-align: top; text-align: left;" |000 |[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_04b.pdf

	Vegetation Management - Exotic Plant Species (Information Sheet)

|- style="vertical-align: top; text-align: left;" |000 |http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_04c.pdf |Invasive Plant Species Observation Information Booklet

|- style="vertical-align: top; text-align: left;" |000 |http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_05a.pdf |AIF: Basin Hydrology and Operations, and PPT |- style="vertical-align: top; text-align: left;" |000 |http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_05b.pdf


	Letter from Grand Canyon Trust to DOI Secretary Dirk Kempthorne, Subject: Protecting Sandbars Built with March 2008 High Flow Test

• Attachment 6: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_06.pdf

	AIF: Humpback Chub Comprehensive Plan and Recovery Implementation Plan Updates and PPT 

• Attachment 7: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_07.pdf

	AIF: 2008 Colorado River Basin Science and Management Symposium, Prospectus, and PPT 

• Attachment 8a: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_08a.pdf

	AIF: Experimental Action - Next Steps; 

• Attachment 8b: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_08b.pdf

	AIF: Conservation Measures form the 2007-2008 AMP Biological Opinion PPT;

• Attachment 8c: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_08c.pdf

	BHBF Policy Issues Ad Hoc Group Update PPT; 
	

• Attachment 8d: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_08d.pdf

	Science Plan for Near Shore Ecology and Fall Steady Flows PPT 

• Attachment 9: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_09.pdf

	AIF: Stakeholder Perspective - Southern Paiute Consortium PPT 

• Attachment 10: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_10.pdf

	AIF: Annual Report to Congress

• Attachment 11a: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_11a.pdf

	AIF: Fiscal Year 2008 Mid-year Expenditures by USBR; 

• Attachment 11b: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_11b.pdf

	GCMRC FY08 Mid-year Expenditures Report Memo dated May 23, 2008, along with table and spreadsheet; 

• Attachment 11c: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_11c.pdf

	GCMRC May Expenditures Report for FY08 PPT

• Attachment 12a: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_12a.pdf

	AIF: Review of FY09 Priorities and Preliminary Budget along with memo from USGS dated April 7, 2008; 

• Attachment 12b: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_12b.pdf

	USBR FY09 Budget Priorities (bar chart) PPT; 

• Attachment 12c: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_12c.pdf

	GCDAMP Preliminary FY09 Budget PPT; 

• Attachment 12d: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_12d.pdf

	TWG Chair Report

• Attachment 13a: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13a.pdf

	AIF: Strategic Plan and Desired Future Conditions with Memo from TWG Chair to Randy Peterson dated January 4, 2008; 

• Attachment 13b: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13b.pdf

	Memo from Mary Orton, Subject: GCDAMP Strategic Plan Timeline and Process dated May 19, 2008; 

• Attachment 13c: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13c.pdf

	Strategic Plan and Adaptive Management Presentation by Lance Gunderson PPT 

• Attachment 14: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_14.pdf

	AIF: Update of Monitoring and Research Plan

• Attachment 15: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_15.pdf

	 Memo from John Hamill to AMWG dated May 20, 2008, Subject: Evaluation of the September-October Steady Flows

• Attachment 16: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_16.pdf

	USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona

• Attachment 17: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_17.pdf

	Letter from DOI Secretary Dirk Kempthorne dated May 20, 2008, to Don Ostler, Upper Colorado River Commission re: ongoing period of experimental releases from Glen Canyon Dam

May 2008 AMWG

Federal Register Notices(s): • Federal Register Notice: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/FRN_08apr28.pdf Pre-Meeting Information: • Correspondence: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Correspondence.pdf • Final Agenda: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Agenda.pdf • Final Meeting Minutes: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Final_Mins.pdf • and Attachments: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attachments.pdf • Attachment 1: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_01.pdf

	Action Item Tracking Report