Difference between revisions of "Library Test"

From Glen Canyon Dam AMP
Jump to: navigation, search
(save)
(test)
Line 53: Line 53:
 
|
 
|
 
|
 
|
 
 
 
|}
 
 
----
 
 
 
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
 
|000
 
|000
Line 292: Line 284:
 
|
 
|
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
|000
+
|000
|Strategic Plan and Desired Future Conditions with Memo from TWG Chair to Randy Peterson dated January 4, 2008
+
|GCDAMP Strategic Plan Timeline and Process 
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13b.pdf LINK]
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13b.pdf LINK]
|GCDAMP Strategic Plan Timeline and Process
 
 
|Science
 
|Science
 
|2008
 
|2008
Line 303: Line 294:
 
|
 
|
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
|000  
+
|000
 +
|Strategic Plan and Adaptive Management Presentation by Lance Gunderson PPT
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13c.pdf LINK]
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_13c.pdf LINK]
|Strategic Plan and Adaptive Management Presentation by Lance Gunderson PPT
 
 
|Science
 
|Science
 
|2008
 
|2008
Line 313: Line 304:
 
|
 
|
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
|000  
+
|000
 +
|AIF: Update of Monitoring and Research Plan
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_14.pdf LINK]
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_14.pdf LINK]
|AIF: Update of Monitoring and Research Plan
 
 
|Monitoring
 
|Monitoring
 
|2008
 
|2008
Line 323: Line 314:
 
|
 
|
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
|000  
+
|000
 +
|Memo: Evaluation of the September-October Steady Flows
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_15.pdf LINK]  
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_15.pdf LINK]  
|Memo: Evaluation of the September-October Steady Flows
 
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_16.pdf
 
 
|Flows
 
|Flows
 
|2008
 
|2008
Line 333: Line 323:
 
|
 
|
 
|
 
|
 +
|- style="vertical-align: top; text-align: left;"
 +
|000
 +
|Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam
 +
|[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_16.pdf
 +
|Flows
 +
|2008
 +
|AMWG
 +
|USGS
 +
|
 +
|Workshop
 
|- style="vertical-align: top; text-align: left;"
 
|- style="vertical-align: top; text-align: left;"
 
|000  
 
|000  
Line 343: Line 343:
 
|
 
|
 
|Workshop- LTEP
 
|Workshop- LTEP
 +
|}
  
  

Revision as of 16:38, 30 July 2013

  • Revision Date_130729

Number TITLE LINK CATEGORY YEAR FORUM CONTRIBUTOR TBD NOTES
000 AIF: Experimental Action: High Flow Experiment, Preliminary Observations and "2008 High Flow Experiment Update PPT" LINK HFE 2008 AMWG
000 Reporting Schedule for Experimental Studies Associated with the March 2008 High Flow Experiment LINK HFE 2008 AMWG
000 2008 High Flow Experiment, Grand Canyon National Park Observations and Monitoring Results PPT LINK HFE 2008 AMWG
000 Long term Fish Monitoring and Preliminary Results of the 2008 High Flow Electrofishing by the Arizona Game and Fish Department PPT LINK HFE 2008 AMWG
000 Long term Fish Monitoring and Preliminary Results of the 2008 High Flow Electrofishing by the Arizona Game and Fish Department PPT LINK Fish 2008 AMWG
000 AIF: An Overview of Science and Resource Management PPT LINK] Science 2008 AMWG
000 Tamarisk Management and Tributary Restoration (Information Sheet) LINK Invasive 2008 AMWG
000 Vegetation Management - Exotic Plant Species (Information Sheet) LINK Invasive 2008 AMWG
000 Invasive Plant Species Observation Information Booklet LINK Invasive 2008 AMWG
000 AIF: Basin Hydrology and Operations, and PPT LINK Hydrology 2008 AMWG
000 Subject: Protecting Sandbars Built with March 2008 High Flow Test LINK HFE 2008 AMWG Grand Canyon Trust Letter to DOI Secretary Dirk Kempthorne
000 AIF: Humpback Chub Comprehensive Plan and Recovery Implementation Plan Updates and PPT LINK HBC 2008 AMWG
000 AIF: 2008 Colorado River Basin Science and Management Symposium, Prospectus -PPT LINK Science 2008 AMWG
000 AIF: Experimental Action - Next Steps LINK Science 2008 AMWG
000 AIF: Conservation Measures form the 2007-2008 AMP Biological Opinion PPT LINK Guiding Docs 2008 AMWG
000 BHBF Policy Issues Ad Hoc Group Update PPT LINK Flows 2008 AMWG
000 Science Plan for Near Shore Ecology and Fall Steady Flows PPT LINK Flows 2008 AMWG
000 Science Plan for Near Shore Ecology and Fall Steady Flows PPT LINK NSE 2008 AMWG
000 AIF: Annual Report to Congress LINK Admin 2008 AMWG
000 AIF: Fiscal Year 2008 Mid-year Expenditures LINK Budget 2008 AMWG USBR
000 FY08 Mid-year Expenditures Report Memo dated May 23, 2008 LINK Budget 2008 AMWG GCMRC
000 Expenditures Report for May -FY08 PPT LINK Budget 2008 AMWG GCMRC
000 AIF: Review of FY09 Priorities and Preliminary Budget along with memo from USGS dated April 7, 2008 LINK Budget 2008 AMWG
000 Budget Priorities-FY09 (bar chart) PPT LINK Budget 2008 AMWG USBR
000 GCDAMP Preliminary FY09 Budget PPT LINK Budget 2008 AMWG
000 TWG Chair Report LINK TWG Chair 2008 AMWG
000 AIF: Strategic Plan and Desired Future Conditions with Memo from TWG Chair LINK DFC 2008 AMWG
000 AIF: Strategic Plan and Desired Future Conditions with Memo from TWG Chair LINK Science 2008 AMWG
000 GCDAMP Strategic Plan Timeline and Process LINK Science 2008 AMWG Mary Orton
000 Strategic Plan and Adaptive Management Presentation by Lance Gunderson PPT LINK Science 2008 AMWG
000 AIF: Update of Monitoring and Research Plan LINK Monitoring 2008 AMWG
000 Memo: Evaluation of the September-October Steady Flows LINK Flows 2008 AMWG John Hamill
000 Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_16.pdf Flows 2008 AMWG USGS Workshop
000 Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona LINK LTEMP 2008 AMWG USGS Workshop- LTEP




	Letter from DOI Secretary Dirk Kempthorne dated May 20, 2008, to Don Ostler, Upper Colorado River Commission re: ongoing period of experimental releases from Glen Canyon Dam

May 2008 AMWG

Federal Register Notices(s): • Federal Register Notice: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/FRN_08apr28.pdf Pre-Meeting Information: • Correspondence: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Correspondence.pdf • Final Agenda: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Agenda.pdf • Final Meeting Minutes: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Final_Mins.pdf • and Attachments: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attachments.pdf • Attachment 1: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/08may22/Attach_01.pdf

	Action Item Tracking Report