Difference between revisions of "GCDAMP- HFE 2013"

From Glen Canyon Dam AMP
Jump to: navigation, search
(test)
(add)
Line 22: Line 22:
 
*[[Media:131022 Basin States Vanderkooi.pdf |131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi]]
 
*[[Media:131022 Basin States Vanderkooi.pdf |131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi]]
  
== TBD ==
+
== COMPLIANCE ==
*
+
*A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
 +
*DOI consultation meeting with the Basin States_ October 22, 2013
  
 
== TBD ==
 
== TBD ==

Revision as of 10:28, 23 October 2013

High Flow Experiment- 2013
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY:

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

TBD

TBD





Contributor: Category: Sediment, Recreation, Water delivery