Difference between revisions of "GCDAMP- HFE 2012"
From Glen Canyon Dam AMP
(details) |
(add http://www.usbr.gov/uc/rm/gcdHFE/2012/) |
||
Line 12: | Line 12: | ||
}} | }} | ||
*'''HFE DETAILS -SUMMARY:''' ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION | *'''HFE DETAILS -SUMMARY:''' ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION | ||
− | * | + | *'''[http://www.usbr.gov/uc/rm/gcdHFE/2012/ USBR 2012 HFE LINK]''' |
* | * | ||
* | * |
Revision as of 09:22, 28 October 2013
High Flow Experiment- 2012 | |
- HFE DETAILS -SUMMARY: ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION
- USBR 2012 HFE LINK
SUPPORTING DOCUMENTS
- 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment
- 131022 Fall 2013 HFE Protocol Decision Process
- 131022 2013 HFE Locations and dates of hydrograph routing
- 131022 System Overview to Basin States- USGS Schmidt
- 131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi
COMPLIANCE
- A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
- DOI consultation meeting with the Basin States_ October 22, 2013
SAND TRANSPORT caused by 2012 HFE
- @ RM30 = 390,000 metric tons
- @ RM60 = 380,000 metric tons
- @ RM87 = 540,000 metric tons
- @ RM225 = 970,000 metric tons
- At Diamond Creek (RM225), 1,810,000 metric tons were transported by the Colorado River between July 1, 2012, and July 1, 2013. Thus, 54% of the total delivery of sand to Lake Mead reservoir during this 1-year period occurred during approximately 5 days of the November 2012 HFE. For comparison, 45% of the total delivery of sand to Lake Mead reservoir during calendar year 2008 occurred during the 2008 HFE; the 2004 HFE delivered 40% of the total sand delivered to Lake Mead in calendar year 2004.