Difference between revisions of "GCDAMP- HFE 2012"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add 2012 HFE -PIC.jpg)
(add az game and fish hfe 2012 video)
Line 17: Line 17:
  
 
== SUPPORTING DOCUMENTS ==
 
== SUPPORTING DOCUMENTS ==
*[[Media:131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF |131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment]]
+
*'''[http://www.youtube.com/watch?v=kNmtWUBYf0s&feature=youtu.be AZ Game & Fish_Glen Canyon Dam High Flow Releases-2012 VIDEO CLIP]'''
*[[Media:131022 Basin States Knowles.pdf |131022 Fall 2013 HFE Protocol Decision Process]]
+
*[[Media:131022 HFE Routing - start11th9AM.pdf |131022 2013 HFE Locations and dates of hydrograph routing]]
+
*[[Media:131022 Basin States Schmidt.pdf |131022 System Overview to Basin States- USGS Schmidt]]
+
*[[Media:131022 Basin States Vanderkooi.pdf |131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi]]
+
  
 
== COMPLIANCE ==
 
== COMPLIANCE ==

Revision as of 09:32, 28 October 2013

High Flow Experiment- 2012
CRC 121119 0038.JPG

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

SAND TRANSPORT caused by 2012 HFE

  • @ RM30 = 390,000 metric tons
  • @ RM60 = 380,000 metric tons
  • @ RM87 = 540,000 metric tons
  • @ RM225 = 970,000 metric tons
  • At Diamond Creek (RM225), 1,810,000 metric tons were transported by the Colorado River between July 1, 2012, and July 1, 2013. Thus, 54% of the total delivery of sand to Lake Mead reservoir during this 1-year period occurred during approximately 5 days of the November 2012 HFE. For comparison, 45% of the total delivery of sand to Lake Mead reservoir during calendar year 2008 occurred during the 2008 HFE; the 2004 HFE delivered 40% of the total sand delivered to Lake Mead in calendar year 2004.

TBD





Contributor: Category: Sediment, Recreation, Water delivery