Difference between revisions of "GCDAMP- HFE 2012"
From Glen Canyon Dam AMP
(add) |
(add football field pic) |
||
Line 32: | Line 32: | ||
== 500,000 Tons of Sediment == | == 500,000 Tons of Sediment == | ||
*'''500,000 tons of sediment is equivelant to filling a football field 230 feet deep''' (KSalazar) | *'''500,000 tons of sediment is equivelant to filling a football field 230 feet deep''' (KSalazar) | ||
− | + | *[[File:Football field- PIC.jpg|thumb]] | |
---- | ---- |
Revision as of 10:06, 28 October 2013
High Flow Experiment- 2012 | |
- HFE DETAILS -SUMMARY: ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION
- USBR 2012 HFE LINK
Contents
SUPPORTING DOCUMENTS
COMPLIANCE
SAND TRANSPORT caused by 2012 HFE
- @ RM30 = 390,000 metric tons
- @ RM60 = 380,000 metric tons
- @ RM87 = 540,000 metric tons
- @ RM225 = 970,000 metric tons
- At Diamond Creek (RM225), 1,810,000 metric tons were transported by the Colorado River between July 1, 2012, and July 1, 2013. Thus, 54% of the total delivery of sand to Lake Mead reservoir during this 1-year period occurred during approximately 5 days of the November 2012 HFE. For comparison, 45% of the total delivery of sand to Lake Mead reservoir during calendar year 2008 occurred during the 2008 HFE; the 2004 HFE delivered 40% of the total sand delivered to Lake Mead in calendar year 2004.
500,000 Tons of Sediment
- 500,000 tons of sediment is equivelant to filling a football field 230 feet deep (KSalazar)
Contributor: Category: Sediment, Recreation, Water delivery