Difference between revisions of "GCDAMP- Hydrograph"
From Glen Canyon Dam AMP
(add) |
(Add Hydrograph motion wording from TWG- 2015) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
|birth_place = | |birth_place = | ||
}} | }} | ||
+ | *'''PURPOSE of HYDROGRAPH:''' | ||
+ | *Develop recommendations for operational hydrographs based on anticipated possible annual release volumes from Glen Canyon Dam consistent with Section 1802 of the Grand Canyon Protection Act. | ||
+ | *The operational hydrographs are within the framework of the 1996 ROD and MLFF operation, consistent with balancing other resources, including power production, and recognize the variability of possible annual release volumes from Glen Canyon Dam under the 2007 Interim Guidelines. | ||
+ | *'''HYDROGRAPH CONCEPT:''' | ||
+ | *Apply sound science principles within the framework of adaptive management to adjust the timing of water deliveries to protect and restore flow-dependent resource conditions. | ||
+ | |||
+ | == 2015 == | ||
+ | *[[2015 Hydrograph Motion Wording]] | ||
+ | == 2014 == | ||
+ | *[http://www.usbr.gov/uc/rm/amp/twg/mtgs/13jun26/Attach_05a.pdf TWG- June 2013- '''Hydrograph 2014'''] | ||
+ | *[http://www.usbr.gov/uc/rm/amp/twg/mtgs/13jun26/Attach_05b.pdf TWG- June 2013- '''Hydrograph 2014''' MOTION] | ||
+ | |||
+ | == 2013 == | ||
* [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06b.pdf TWG Report -'''Hydrograph 2013'''] | * [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06b.pdf TWG Report -'''Hydrograph 2013'''] | ||
* [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06a.pdf AMWG-August 2012- '''Hydrograph 2013'''] | * [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06a.pdf AMWG-August 2012- '''Hydrograph 2013'''] | ||
− | + | == 2012 == | |
+ | * [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/11aug24/Attach_09.pdf AMWG-August 2011- '''Hydrograph 2012] | ||
+ | * [http://www.usbr.gov/uc/rm/amp/twg/mtgs/11jun28/Attach_08b.pdf TWG-June 2011- '''Hydrograph 2012] | ||
+ | * [http://www.usbr.gov/uc/rm/amp/twg/mtgs/11jun28/Attach_08a.pdf 2012 Hydrograph development PPT] | ||
+ | |||
+ | == 2011 == | ||
+ | *[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07b.pdf AMWG- August 2010- '''Hydrograph 2011'''] | ||
+ | *Proposed Water year 2011 Hydrograph: Impacts on CRSP Electric Power Resources [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07e.pdf ] | ||
+ | *Grand Canyon Trust '''Hydrograph Proposal 2011''' [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07f.pdf Attachment 7f] | ||
+ | |||
− | + | ---- | |
− | + | ||
− | + | ||
Contributor: | Contributor: | ||
Category: Water delivery | Category: Water delivery |
Latest revision as of 13:03, 7 July 2014
Hydrograph Learning Page | |
- PURPOSE of HYDROGRAPH:
- Develop recommendations for operational hydrographs based on anticipated possible annual release volumes from Glen Canyon Dam consistent with Section 1802 of the Grand Canyon Protection Act.
- The operational hydrographs are within the framework of the 1996 ROD and MLFF operation, consistent with balancing other resources, including power production, and recognize the variability of possible annual release volumes from Glen Canyon Dam under the 2007 Interim Guidelines.
- HYDROGRAPH CONCEPT:
- Apply sound science principles within the framework of adaptive management to adjust the timing of water deliveries to protect and restore flow-dependent resource conditions.
2015
2014
2013
2012
2011
- AMWG- August 2010- Hydrograph 2011
- Proposed Water year 2011 Hydrograph: Impacts on CRSP Electric Power Resources [1]
- Grand Canyon Trust Hydrograph Proposal 2011 Attachment 7f
Contributor: Category: Water delivery