Difference between revisions of "Strategic Science Plan"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 45: | Line 45: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">The Strategic Science Plan</h2> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">The Strategic Science Plan (SSP) </h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | This Strategic Science Plan is based on the adaptive management paradigm discussed above wherein new science | + | This Strategic Science Plan (SSP) is based on the adaptive management paradigm discussed above wherein new science |
information is continually cycled into application by managers, and outcomes are monitored by | information is continually cycled into application by managers, and outcomes are monitored by | ||
scientists and managers for effectiveness. This process requires highly focused applied science | scientists and managers for effectiveness. This process requires highly focused applied science | ||
projects that address specific management information needs. Consistent with the adaptive | projects that address specific management information needs. Consistent with the adaptive | ||
management paradigm, the GCMRC’s science strategy will emphasize four elements: | management paradigm, the GCMRC’s science strategy will emphasize four elements: | ||
+ | |||
*Performing interdisciplinary, integrated river science | *Performing interdisciplinary, integrated river science | ||
*Building bridges between science and management | *Building bridges between science and management | ||
− | *Formulating strategic science questions to address the | + | *Formulating strategic science questions to address the [[Media:Strategic Science Questions.docx| 2004 GCDAMP Goals & AMWG Priority Questions]] |
*Addressing critical research and monitoring needs outside the scope of the GCDAMP | *Addressing critical research and monitoring needs outside the scope of the GCDAMP | ||
Line 67: | Line 68: | ||
|class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"| | |class="MainPageBG" style="width:45%; border:1px solid #cedff2; background:#f5faff; vertical-align:top;"| | ||
{| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {| width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Documents</h2> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Documents and Links</h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
Line 73: | Line 74: | ||
*[[Media:Strategic Science Plan FY07-11 (1).pdf| 2007-11 Strategic Science Plan]] | *[[Media:Strategic Science Plan FY07-11 (1).pdf| 2007-11 Strategic Science Plan]] | ||
*[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | *[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | ||
− | + | *[[Media:2004 GCDAMP Goals&PriorityQuestions.docx| 2004 GCDAMP Goals & AMWG Priority Questions]] | |
− | + | *Back to [[GCDAMP Planning]] | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | *[[Media:2004 GCDAMP Goals&PriorityQuestions.docx| 2004 GCDAMP Goals & Priority Questions]] | + | |
|- | |- | ||
Line 93: | Line 84: | ||
|- | |- | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">ADHOC groups</h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| |
Revision as of 14:41, 15 July 2016
|
The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
GCDAMP Strategic Plan The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. |
Strategic Science Plan The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
Core Monitoring Plan The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. |
Monitoring and Research Plan The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions. |
Triennial Work Plan (TWP) The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
---|
|
|