Difference between revisions of "GCDAMP- HFE 2016"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 15: Line 15:
 
}}
 
}}
  
*'''HFE DETAILS -SUMMARY:'''  
+
*'''HFE DETAILS:'''  
 
*Sediment in the system:  '''TBD'''
 
*Sediment in the system:  '''TBD'''
 
*Peak CFS:  '''35,100 cfs'''  
 
*Peak CFS:  '''35,100 cfs'''  
*Estimated costs to hydropower:  '''TBD'''
+
*Powerplant capacity = '''20,100 cfs'''  
*Actual costs to hydropower: '''TBD'''
+
*Units available: '''6'''
 +
*Bypass tube capacity = '''15,000 cfs'''  
 
*Estimated acre feet of water bypassed during HFE:  '''125 kaf'''
 
*Estimated acre feet of water bypassed during HFE:  '''125 kaf'''
 +
*November volume = '''649 kaf'''
 
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
 
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
 +
*Estimated costs to hydropower:  '''TBD'''
 +
*Actual costs to hydropower:  '''TBD'''
 
*Direct expenses for removal of concession assets:  '''TBD'''
 
*Direct expenses for removal of concession assets:  '''TBD'''
*Units available: '''6'''
 
*Powerplant capacity = '''20,100 cfs'''
 
*November volume = '''649 kaf'''
 
 
*Start Upramp: '''TBD'''  
 
*Start Upramp: '''TBD'''  
 
*Finish HFE: '''TBD'''   
 
*Finish HFE: '''TBD'''   

Revision as of 11:53, 14 October 2016

SUMMARY

High Flow Experiment- 2016
CRC 121119 0038.JPG
  • HFE DETAILS:
  • Sediment in the system: TBD
  • Peak CFS: 35,100 cfs
  • Powerplant capacity = 20,100 cfs
  • Units available: 6
  • Bypass tube capacity = 15,000 cfs
  • Estimated acre feet of water bypassed during HFE: 125 kaf
  • November volume = 649 kaf
  • Hourly Releases before and after HFE: fluctuate between 5,000 to 8,000 cfs
  • Estimated costs to hydropower: TBD
  • Actual costs to hydropower: TBD
  • Direct expenses for removal of concession assets: TBD
  • Start Upramp: TBD
  • Finish HFE: TBD
  • Total HFE duration: 96 hrs
  • HFE 2016 represents the 4th controlled high flow release conducted under the HFE Protocol.

SUPPORTING DOCUMENTS

COMPLIANCE

CONCERNS

SEDIMENT

ADDITIONAL