Difference between revisions of "The 2018 Fall HFE"
From Glen Canyon Dam AMP
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 41: | Line 41: | ||
== ADDITIONAL == | == ADDITIONAL == | ||
+ | *[https://www.azcentral.com/story/news/local/arizona-environment/2018/11/05/grand-canyon-flooded-high-flow-experiment-colorado-river-federal-officials-glen-canyon-dam-lake-mead/1861287002/ AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River] | ||
<center> | <center> |
Revision as of 11:15, 6 November 2018
High Flow Experiment- 2018 | |
Contents
2018 High Flow Experiment Snapshot
Sediment Conditions
Fall Accounting Period
- Paria input (Jul 1 - Sept 21): 709,000
- Accumulated in Upper Marble Canyon (Jul 1 - Sept 4, lower bound) = 238,000
- Accumulated in Lower Marble Canyon (Jul 1 - Sept 4, lower bound) = 84,000
- Available for HFE: 238,000 + 84,000 = 322,000
HFE Transport
- Paria input (Nov 5 - 10):
- Evacuated from Upper Marble Canyon (Nov 5 - 10, lower bound) =
- Evacuated from Lower Marble Canyon (Nov 5 - 10, lower bound) =
- Left over in Marble Canyon after HFE (Nov 5 - 10):
Winter Accounting Period
- Paria input (Nov 11 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for spring HFE:
SUPPORTING DOCUMENTS
COMPLIANCE
CONCERNS
ADDITIONAL