Difference between revisions of "The 2018 Fall HFE"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 2: Line 2:
 
{{Infobox Person
 
{{Infobox Person
 
|name          = High Flow Experiment- 2018
 
|name          = High Flow Experiment- 2018
|image        = CRC 121119 0038.JPG
+
|image        = 2018HFE_lights.jpg
 
|alma_mater    =  
 
|alma_mater    =  
|Job Title  = November 7-11
+
|Job Title  = November 5-8
 
|Previous_Title_ =  
 
|Previous_Title_ =  
 
|Previous_Title_ =  
 
|Previous_Title_ =  
Line 34: Line 34:
 
*Available for spring HFE:   
 
*Available for spring HFE:   
  
== SUPPORTING DOCUMENTS ==
+
==HFE Details==
 +
'''Schedule & Duration'''
 +
*Nov. 5 - 6:00 a.m. begin upramp to powerplant capacity (~23,100 cfs) [7 generation units]
 +
*Nov. 5 - 11:00 a.m. open bypass tubes, reach full bypass at 2:00 p.m.
 +
*Nov. 8 - 9:00 a.m. end of bypass
 +
*Nov. 8 - 3:00 p.m. end of High Flow Experiment
 +
*Total duration: 3 days & 10 hours; 2 ½ days at peak release (60 hours)
 +
 
 +
'''Ramp Rates'''
 +
*Ramp up: 4,000 cfs/hr from 6,500 - 23,100 cfs, then 3,750 cfs/hr to peak (38,100 cfs)
 +
*Ramp down: 1,875 cfs/hr from 38,100 – 23,100 cfs, then 2,500 cfs/hr to 9,000 cfs
 +
 
 +
'''HFE Release Details'''[[File:2018HFE.jpg|thumb|right|400px|https://www.usbr.gov/uc/rm/gcdHFE/]]
 +
*Maximum total release: 38,100 cfs
 +
*Powerplant capacity: 23,100 cfs
 +
*River outlet tubes: 15,000 cfs
 +
*Hydropower generation units available: 7 (one unit off-line for replacement)
 +
*River outlet tubes: 4
 +
 
 +
'''Releases and Lake Elevation'''
 +
*Releases will range from 6,500 - 9,000 cfs prior to and after the HFE
 +
*Lake elevation is projected to decrease by approximately 7 inches during the 3-day experiment
 +
 
 +
'''Costs'''
 +
*Estimated costs to hydropower:  '''TBD'''
 +
*Actual costs to hydropower:  '''TBD'''
 +
*Direct expenses for removal of concession assets:  '''TBD'''
 +
 
 +
== SUPPORTING DOCUMENTS == [[File:2018HFE_traveltime.jpg|thumb|right|400px|https://www.usbr.gov/uc/rm/gcdHFE/]]
 +
*[https://www.usbr.gov/uc/rm/gcdHFE/pdfs/20181018%20DOI%20HFE%20Decision%20Memo_ASWS%20Signed_with%20attachments.pdf 2018 High Flow Experimental Release Decision Memorandum]
  
 
== COMPLIANCE ==
 
== COMPLIANCE ==
 +
*[https://www.usbr.gov/newsroom/newsrelease/detail.cfm?RecordID=63503 Interior Initiates High-Flow Experiment at Glen Canyon Dam]
 +
*[https://www.usbr.gov/newsroom/newsrelease/detail.cfm?RecordID=63424 Media Advisory: High-Flow Experiment at Glen Canyon Dam]
  
 
== CONCERNS ==
 
== CONCERNS ==
Line 42: Line 73:
 
== ADDITIONAL ==
 
== ADDITIONAL ==
 
*[https://www.azcentral.com/story/news/local/arizona-environment/2018/11/05/grand-canyon-flooded-high-flow-experiment-colorado-river-federal-officials-glen-canyon-dam-lake-mead/1861287002/ AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River]
 
*[https://www.azcentral.com/story/news/local/arizona-environment/2018/11/05/grand-canyon-flooded-high-flow-experiment-colorado-river-federal-officials-glen-canyon-dam-lake-mead/1861287002/ AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River]
 +
*[https://www.youtube.com/watch?v=H3UIW_KZddg&feature=youtu.be Lighted bypass tube video]
 +
*[https://www.youtube.com/watch?v=bchH2m80Y3g Colorado River Pearce Ferry Rapid After High Flow Release From Glen Canyon Dam]
  
 
<center>
 
<center>

Revision as of 11:51, 19 November 2018

High Flow Experiment- 2018
2018HFE lights.jpg

2018 High Flow Experiment Snapshot

Sediment Conditions

Fall Accounting Period

  • Paria input (Jul 1 - Sept 21): 709,000
  • Accumulated in Upper Marble Canyon (Jul 1 - Sept 4, lower bound) = 238,000
  • Accumulated in Lower Marble Canyon (Jul 1 - Sept 4, lower bound) = 84,000
  • Available for HFE: 238,000 + 84,000 = 322,000

HFE Transport

  • Paria input (Nov 5 - 10):
  • Evacuated from Upper Marble Canyon (Nov 5 - 10, lower bound) =
  • Evacuated from Lower Marble Canyon (Nov 5 - 10, lower bound) =
  • Left over in Marble Canyon after HFE (Nov 5 - 10):

Winter Accounting Period

  • Paria input (Nov 11 to Apr 1):
  • Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Available for spring HFE:

HFE Details

Schedule & Duration

  • Nov. 5 - 6:00 a.m. begin upramp to powerplant capacity (~23,100 cfs) [7 generation units]
  • Nov. 5 - 11:00 a.m. open bypass tubes, reach full bypass at 2:00 p.m.
  • Nov. 8 - 9:00 a.m. end of bypass
  • Nov. 8 - 3:00 p.m. end of High Flow Experiment
  • Total duration: 3 days & 10 hours; 2 ½ days at peak release (60 hours)

Ramp Rates

  • Ramp up: 4,000 cfs/hr from 6,500 - 23,100 cfs, then 3,750 cfs/hr to peak (38,100 cfs)
  • Ramp down: 1,875 cfs/hr from 38,100 – 23,100 cfs, then 2,500 cfs/hr to 9,000 cfs
HFE Release Details
  • Maximum total release: 38,100 cfs
  • Powerplant capacity: 23,100 cfs
  • River outlet tubes: 15,000 cfs
  • Hydropower generation units available: 7 (one unit off-line for replacement)
  • River outlet tubes: 4

Releases and Lake Elevation

  • Releases will range from 6,500 - 9,000 cfs prior to and after the HFE
  • Lake elevation is projected to decrease by approximately 7 inches during the 3-day experiment

Costs

  • Estimated costs to hydropower: TBD
  • Actual costs to hydropower: TBD
  • Direct expenses for removal of concession assets: TBD
== SUPPORTING DOCUMENTS ==

COMPLIANCE

CONCERNS

ADDITIONAL