Difference between revisions of "The 2017 Fall HFE"
From Glen Canyon Dam AMP
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 14: | Line 14: | ||
== 2017 High Flow Experiment Snapshot == | == 2017 High Flow Experiment Snapshot == | ||
− | * | + | *A 2017 HFE was not conducted for lack of adequate sediment input from the Paria River |
==Sediment Conditions== | ==Sediment Conditions== |
Revision as of 10:08, 21 July 2021
High Flow Experiment- 2017 | |
Contents
2017 High Flow Experiment Snapshot
- A 2017 HFE was not conducted for lack of adequate sediment input from the Paria River
Sediment Conditions
Fall Accounting Period- Paria input (Jul 1 - Nov 30): 274,189
- Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) = 1,500
- Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) = 1,100
- Available for HFE: 1,500 + 1,100 = 1,600
- Paria input (Dec 1 to Apr 1): 17,000
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) = -187,000
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) = -16,000
- Available for spring HFE: -187,000 + -16,000 = -203,000