Difference between revisions of "The 2020 Spring HFE"
From Glen Canyon Dam AMP
Cellsworth (Talk | contribs) (Created page with " {{Infobox Person |name = High Flow Experiment- 2020 |image = CRC 121119 0038.JPG |alma_mater = |Job Title = November 7-11 |Previous_Title_ = |Previ...") |
Cellsworth (Talk | contribs) |
||
Line 14: | Line 14: | ||
== 2020 Spring High Flow Experiment Snapshot == | == 2020 Spring High Flow Experiment Snapshot == | ||
− | * | + | *A 2020 Spring HFE was not conducted for lack of adequate sediment input from the Paria River |
==Sediment Conditions== | ==Sediment Conditions== |
Revision as of 10:11, 21 July 2021
High Flow Experiment- 2020 | |
Contents
2020 Spring High Flow Experiment Snapshot
- A 2020 Spring HFE was not conducted for lack of adequate sediment input from the Paria River
Sediment Conditions
Winter Accounting Period
- Paria input (Dec 1 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for Spring HFE:
SUPPORTING DOCUMENTS
COMPLIANCE
CONCERNS
ADDITIONAL