Difference between revisions of "Glen Canyon Dam Adaptive Management ADMINISTRATIVE HISTORY"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 33: | Line 33: | ||
{| style="width:100%; height:50px" border=1px solid #ccc; background:#cedff2 | {| style="width:100%; height:50px" border=1px solid #ccc; background:#cedff2 | ||
! style="width=33%; background:#cedff2;" | -- <br> | ! style="width=33%; background:#cedff2;" | -- <br> | ||
| − | ! style="width=33%; background:#cedff2;" | -- <br> | + | ! style="width=33%; background:#cedff2;" | [[GCDAMP History Time-Line -Years| Click here to see the Expanded GCDAMP History Timeline ]] <br> |
! style="width=33%; background:#cedff2;" | -- <br> | ! style="width=33%; background:#cedff2;" | -- <br> | ||
|} | |} | ||
| Line 43: | Line 43: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| − | |||
| − | |||
==Glen Canyon Environmental Studies - Phase I (1982-1988)== | ==Glen Canyon Environmental Studies - Phase I (1982-1988)== | ||
| Line 183: | Line 181: | ||
==AMWG Colorado River trip (1999)== | ==AMWG Colorado River trip (1999)== | ||
| − | As described in Mary Orton’s oral history interview, this trip through Grand Canyon helped soothe contention among AMWG stakeholders, who had not been working together for very long, and resulted in a Vision Statement for the group. Most oral history interviewees involved in GCDAMP at the time have shared a recollection of the trip or its impact on the program. | + | As described in Mary Orton’s oral history interview, this trip through Grand Canyon helped soothe contention among AMWG stakeholders, who had not been working together for very long, and resulted in a Vision and Mission Statement for the group. Most oral history interviewees involved in GCDAMP at the time have shared a recollection of the trip or its impact on the program. |
| + | |||
| + | The combined Vision and Mission statement reads as follows: | ||
| + | *The Grand Canyon is a homeland for some, sacred to many, and a national treasure for all. In honor of past generations, and on behalf of those of the present and future, we envision an ecosystem where the resources and natural processes are in harmony under a stewardship worthy of the Grand Canyon. | ||
| + | *We advise the Secretary of the Interior on how best to protect, mitigate adverse impacts to, and improve the integrity of the Colorado River ecosystem affected by Glen Canyon Dam, including natural biological diversity (emphasizing native biodiversity), traditional cultural properties’ spiritual values, and cultural, physical, and recreational resources through the operation of Glen Canyon Dam and other means. | ||
| + | *We do so in keeping with the federal trust responsibilities to Indian tribes, in compliance with applicable federal, state, and tribal laws, including the water delivery obligations of the Law of the River, and with due consideration to the economic value of power resources. | ||
| + | *This will be accomplished through our long-term partnership utilizing the best available scientific and other information through an adaptive ecosystem management process. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | ||
==Publication of first GCDAMP Strategic Plan (2001)== | ==Publication of first GCDAMP Strategic Plan (2001)== | ||
| Line 189: | Line 193: | ||
“This strategic plan is a guidance document for the Glen Canyon Dam Adaptive Management Program and was developed by program members. Elements of this plan include the Glen Canyon Dam Adaptive Management Work Group’s vision and mission statements, as well as principles, goals, and management objectives.” (From the Foreword to the Stategic Plan) | “This strategic plan is a guidance document for the Glen Canyon Dam Adaptive Management Program and was developed by program members. Elements of this plan include the Glen Canyon Dam Adaptive Management Work Group’s vision and mission statements, as well as principles, goals, and management objectives.” (From the Foreword to the Stategic Plan) | ||
| − | == | + | ==[http://www.riversimulator.org/Resources/Legal/GCD/ReclamationLTEPwebPage.pdf Long-Term Experimental Plan (LTEP) EIS (2006)] == |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
The Long-Term Experimental Plan Environmental Impact Statement (LTEP | The Long-Term Experimental Plan Environmental Impact Statement (LTEP | ||
| Line 211: | Line 207: | ||
test that was completed in early March 2008. | test that was completed in early March 2008. | ||
| − | == | + | ==[https://gcdamp.com/index.php/Portal:Desired_Future_Conditions_-DFCs Desired Future Conditions (2012)]== |
| − | + | Desired Future Conditions were developed as statements of qualitative goals and objectives for the AMP, | |
| + | realistic and achievable through the operation of Glen Canyon Dam and related activities, subject | ||
| + | to the Law of the River and other laws and authorities and consistent with the Grand Canyon | ||
| + | Protection Act. | ||
| − | ==LTEMP EIS (2016)== | + | ==[https://gcdamp.com/index.php/The_HFE_Page The High Flow Experiment (HFE) Protocol (2012)]== |
| + | |||
| + | An HFE Protocol was developed in 2012 and describes how these experimental releases are designed to achieve a better understanding of whether, how, and when to incorporate high releases into future dam operations in a manner that maintains or improves beaches, sandbars, and associated habitat. The LTEMP HFE Protocol establishes a decision-making framework consisting of three components: (1) planning and budgeting, (2) modeling, and (3) decision and implementation. | ||
| + | |||
| + | Under the 2016 LTEMP, HFE releases are restricted to limited periods of the year when the highest volumes of sediment are most likely available for building sandbars. Sediment-triggered HFEs may be made in spring (March to June) or fall (October to November; Figure 1). Fall extended-duration HFEs range from greater than 96 hr to 250 hr. Spring and fall HFEs that are not extended-duration range from less than 1 hr to 96 hr. Proactive HFEs may be implemented in spring or early summer (April, May or June), and have a duration range up to 24 hr. HFE magnitudes range from 31,500 cubic feet per second (cfs) to 45,000 cfs. The frequency of HFEs is determined by tributary sediment inputs, annual release volumes, resource conditions, and decisions of the Department. Extended-duration fall HFEs are limited to a frequency of 4 times total in the 20-year LTEMP period. | ||
| + | |||
| + | ==[https://gcdamp.com/index.php/Long-term_Experimental_and_Management_Plan_(LTEMP) The Long-term Experimental and Management Plan (LTEMP) EIS (2016)]== | ||
LTEMP “provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years.” | LTEMP “provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years.” | ||
| + | |||
| + | The purpose of the proposed action is to provide a comprehensive framework for adaptively managing Glen Canyon Dam over the next 20 years consistent with the GCPA and other provisions of applicable Federal law. The proposed action will help determine specific dam operations and actions that could be implemented to improve conditions and continue to meet the GCPA's requirements and to minimize, consistent with law-adverse impacts on the downstream natural, recreational, and cultural resources in the two park units, including resources of importance to American Indian Tribes. | ||
| + | |||
| + | The need for the proposed action stems from the need to use scientific information developed since the 1996 ROD to better inform DOI decisions on dam operations and other management and experimental actions so that the Secretary of the Interior may continue to meet statutory responsibilities for protecting downstream resources for future generations, conserving species listed under the Endangered Species Act (ESA), avoiding or mitigating impacts on National Register of Historic Places (NRHP)-eligible properties, and protecting the interests of American Indian Tribes, while meeting obligations for water delivery and the generation of hydroelectric power. | ||
|} | |} | ||
Latest revision as of 15:00, 29 September 2026
|
|
History of the Glen Canyon Dam Adaptive Management ProgramThe Secretary of the Interior Bruce Babbitt, created the Glen Canyon Dam Adaptive Management Program (GCDAMP) in response to the 1995 Environmental Impact Statement on the Operations of Glen Canyon Dam. The GCDAMP is responsible for implementation of the Grand Canyon Protection Act of 1992, to monitor the operation of Glen Canyon Dam, to ensure the dam is operated in compliance with a range of laws and regulations and mitigate any significant environmental impacts. [1] |
| -- |