Difference between revisions of "GCDAMP- Hydrograph"

From Glen Canyon Dam AMP
Jump to: navigation, search
(bp)
 
(Add Hydrograph motion wording from TWG- 2015)
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{Infobox Person
 
{{Infobox Person
|name          = Rapid Response Manuscript
+
|name          = Hydrograph Learning Page
|image        = Rapid Response- Analysis-PIC.jpg
+
|image        = CRC 121119 0038.JPG
 
|alma_mater    =  
 
|alma_mater    =  
 
|Job Title    =  
 
|Job Title    =  
Line 11: Line 11:
 
|birth_place  =  
 
|birth_place  =  
 
}}
 
}}
 +
*'''PURPOSE of HYDROGRAPH:'''
 +
*Develop recommendations for operational hydrographs based on anticipated possible annual release volumes from Glen Canyon Dam consistent with Section 1802 of the Grand Canyon Protection Act.
 +
*The operational hydrographs are within the framework of the 1996 ROD and MLFF operation, consistent with balancing other resources, including power production, and recognize the variability of possible annual release volumes from Glen Canyon Dam under the 2007 Interim Guidelines.
 +
*'''HYDROGRAPH CONCEPT:'''
 +
*Apply sound science principles within the framework of adaptive management to adjust the timing of water deliveries to protect and restore flow-dependent resource conditions.
  
*'''Please find the following document enclosed “An Analysis of the Rapid Response High Flow Experiment – Implementation.”'''
 
*  This analysis is provided to support Reclamation’s intention to implement a Rapid Response experiment as described in Reclamation’s “Final Environmental Assessment for the Development and Implementation of a Protocol for High-Flow Experimental Releases from Glen Canyon Dam, Arizona, 2001-2020” (EA). The experiment would time maximum powerplant releases at Glen Canyon Dam (GCD) with Paria River floods, primarily to help restore beach and backwater areas in Marble Canyon. However, concerns were raised in the EA, and additional follow up was needed before a test could be implemented. We hope that this document helps to answer some of the questions that Reclamation may have, specifically relating to operations.
 
  
The research described in this document:  
+
== 2015 ==
 +
*[[2015 Hydrograph Motion Wording]]
 +
== 2014 ==
 +
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/13jun26/Attach_05a.pdf TWG- June 2013- '''Hydrograph 2014''']
 +
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/13jun26/Attach_05b.pdf TWG- June 2013- '''Hydrograph 2014''' MOTION]
  
*    identifies how operationally Paria River flood events can be linked to maximum powerplant releases from GCD to induce sediment-enriched flows in Marble Canyon,
+
== 2013 ==
*   describes how  Western can manipulate power schedules to facilitate a Rapid Response HFE and includes several examples,
+
* [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06b.pdf TWG Report -'''Hydrograph 2013''']
*    shows that Paria River floods can be adequately predicted and that a flood can be timed to be coincident with a flood reaching the mainstem,
+
* [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/12aug29/Attach_06a.pdf AMWG-August 2012- '''Hydrograph 2013''']
*    shows the types of pre-planning that will need to be in place, and
+
*   shows what additional consideration will be needed, working with the NPS, related to safety issues for recreational users downstream.
+
This research allows the authors to conclude that these flood events can be successfully timed with maximum powerplant flows at GCD to have similar stage as bypass assisted high flow events. The document also identifies how operations at GCD can be adjusted to respond to the short-time notice (hours) of impending flood flows at the mouth of the Paria River as well as the safety implications of rapid high-flow changes below GCD and in the upper reaches of the Grand Canyon. Reclamation’s Technical Report No. SRH-2012-08, “Determining Large Flood Events on the Paria River for a Rapid Response Alternative High Flow Experiment,” also addresses similar technical information.
+
  
The analysis provided in this document, along with Reclamation’s technical report mentioned above, Western’s September 2010 proposal, and the EA should provide sufficient information to begin further National Environmental Policy Act compliance for a Rapid Response HFE protocol and the development of a science plan. We understand that safety issues need further consideration and we would look forward to discussing these with the National Park Service and others.
+
== 2012 ==
 +
* [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/11aug24/Attach_09.pdf AMWG-August 2011- '''Hydrograph 2012]
 +
* [http://www.usbr.gov/uc/rm/amp/twg/mtgs/11jun28/Attach_08b.pdf TWG-June 2011- '''Hydrograph 2012]
 +
* [http://www.usbr.gov/uc/rm/amp/twg/mtgs/11jun28/Attach_08a.pdf 2012 Hydrograph development PPT]
  
Western is available to work with the Department of the Interior and the Colorado River Basin States to test and implement these operational changes and to move forward with Rapid Response HFE protocol that can both sustain the value of power generation at GCD and conserve sediment resources in the upper reaches of Grand Canyon to the maximum amount possible.
+
== 2011 ==
 +
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07b.pdf AMWG- August 2010- '''Hydrograph 2011''']
 +
*Proposed Water year 2011 Hydrograph: Impacts on CRSP Electric Power Resources [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07e.pdf ]
 +
*Grand Canyon Trust '''Hydrograph Proposal 2011''' [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07f.pdf Attachment 7f]
  
'''[[Media:RR HFE manuscript.pdf| Rapid Response HFE manuscript]]'''
 
  
Contributor: Craig Ellsworth, Western Area Power Administration
+
----
Category: Sediment
+
 
 +
Contributor:  
 +
Category: Water delivery

Latest revision as of 13:03, 7 July 2014

Hydrograph Learning Page
CRC 121119 0038.JPG
  • PURPOSE of HYDROGRAPH:
  • Develop recommendations for operational hydrographs based on anticipated possible annual release volumes from Glen Canyon Dam consistent with Section 1802 of the Grand Canyon Protection Act.
  • The operational hydrographs are within the framework of the 1996 ROD and MLFF operation, consistent with balancing other resources, including power production, and recognize the variability of possible annual release volumes from Glen Canyon Dam under the 2007 Interim Guidelines.
  • HYDROGRAPH CONCEPT:
  • Apply sound science principles within the framework of adaptive management to adjust the timing of water deliveries to protect and restore flow-dependent resource conditions.


2015

2014

2013

2012

2011



Contributor: Category: Water delivery