The following TWG motion (proposed by Ted Kowalski, seconded by Vineetha Kartha) was passed by consensus on June 25, 2014:
+
*The following TWG motion (proposed by Ted Kowalski, seconded by Vineetha Kartha) was passed by consensus on June 25, 2014:
  
TWG recommends the AMWG recommend to the Secretary of the Interior her approval of the DOI-DOE Proposed Hydrograph for Water Year 2015 as follows:
+
*TWG recommends the AMWG recommend to the Secretary of the Interior her approval of the DOI-DOE Proposed Hydrograph for Water Year 2015 as follows:
 
   
 
   
Annual Release Volumes will be determined by the 2007 Interim Guidelines and shall be reviewed and adopted through the normal annual operating plan process (in consultation with the Basin States as appropriate).
+
**Annual Release Volumes will be determined by the 2007 Interim Guidelines and shall be reviewed and adopted through the normal annual operating plan process (in consultation with the Basin States as appropriate).
Monthly Release Volumes are anticipated to shift depending upon: (1) the projected Annual Release Volume, (2) powerplant capacity, and (3) the magnitude of a potential High Flow Experiment.
+
**Monthly Release Volumes are anticipated to shift depending upon: (1) the projected Annual Release Volume, (2) powerplant capacity, and (3) the magnitude of a potential High Flow Experiment.
Monthly Release Volumes may vary within the targets identified below. Any remaining monthly operational flexibility will be used for existing power production operations under the Modified Low Fluctuating Flow (MLFF) alternative selected by the 1996 ROD and contained in the 1995 FEIS and in compliance with all applicable NEPA compliance documents (HFE EA, NNFC EA, 2007 IG).
+
**Monthly Release Volumes may vary within the targets identified below. Any remaining monthly operational flexibility will be used for existing power production operations under the Modified Low Fluctuating Flow (MLFF) alternative selected by the 1996 ROD and contained in the 1995 FEIS and in compliance with all applicable NEPA compliance documents (HFE EA, NNFC EA, 2007 IG).
Release objective for June is:
+
*Release objective for June is:
600 to 650 kaf for annual releases below 9.0 maf
+
*600 to 650 kaf for annual releases below 9.0 maf
800 kaf for annual releases of 9.0 maf to less than 9.5 maf
+
*800 kaf for annual releases of 9.0 maf to less than 9.5 maf
900 kaf for annual releases of 9.5 to less than 10 maf
+
*900 kaf for annual releases of 9.5 to less than 10 maf
Greater than 900 kaf for annual releases 10 maf and greater
+
*Greater than 900 kaf for annual releases 10 maf and greater
Release objective for August is 800 kaf
+
*Release objective for August is 800 kaf
Release objective for September is:
+
*Release objective for September is:
600 kaf for annual releases below 9.0 maf
+
*600 kaf for annual releases below 9.0 maf
700 kaf for annual releases of 9.0 maf to less than 10.0 maf
+
*700 kaf for annual releases of 9.0 maf to less than 10.0 maf
800 kaf or greater for annual releases of 10.0 maf or greater; up to powerplant capacity for high equalization releases
+
*800 kaf or greater for annual releases of 10.0 maf or greater; up to powerplant capacity for high equalization releases
Monthly Release Volumes will generally strive to maintain 600 kaf levels in the shoulder months (spring and fall) and 800 kaf in the December/January and July/August timeframe.
+
*Monthly Release Volumes will generally strive to maintain 600 kaf levels in the shoulder months (spring and fall) and 800 kaf in the December/January and July/August timeframe.
Additionally, the Bureau of Reclamation will continue to apply best professional judgment in conducting actual operations and in response to changing conditions throughout the water year. Such efforts will continue to be undertaken in coordination with the DOI/DOE agencies, and in consultation with the Basin States as appropriate, to consider changing conditions and adjust projected operations in a manner consistent with the objectives of these parameters as stated above and pursuant to the Law of the River.
+
**Additionally, the Bureau of Reclamation will continue to apply best professional judgment in conducting actual operations and in response to changing conditions throughout the water year. Such efforts will continue to be undertaken in coordination with the DOI/DOE agencies, and in consultation with the Basin States as appropriate, to consider changing conditions and adjust projected operations in a manner consistent with the objectives of these parameters as stated above and pursuant to the Law of the River.

Latest revision as of 13:05, 7 July 2014

  • The following TWG motion (proposed by Ted Kowalski, seconded by Vineetha Kartha) was passed by consensus on June 25, 2014:
  • TWG recommends the AMWG recommend to the Secretary of the Interior her approval of the DOI-DOE Proposed Hydrograph for Water Year 2015 as follows:
    • Annual Release Volumes will be determined by the 2007 Interim Guidelines and shall be reviewed and adopted through the normal annual operating plan process (in consultation with the Basin States as appropriate).
    • Monthly Release Volumes are anticipated to shift depending upon: (1) the projected Annual Release Volume, (2) powerplant capacity, and (3) the magnitude of a potential High Flow Experiment.
    • Monthly Release Volumes may vary within the targets identified below. Any remaining monthly operational flexibility will be used for existing power production operations under the Modified Low Fluctuating Flow (MLFF) alternative selected by the 1996 ROD and contained in the 1995 FEIS and in compliance with all applicable NEPA compliance documents (HFE EA, NNFC EA, 2007 IG).
  • Release objective for June is:
  • 600 to 650 kaf for annual releases below 9.0 maf
  • 800 kaf for annual releases of 9.0 maf to less than 9.5 maf
  • 900 kaf for annual releases of 9.5 to less than 10 maf
  • Greater than 900 kaf for annual releases 10 maf and greater
  • Release objective for August is 800 kaf
  • Release objective for September is:
  • 600 kaf for annual releases below 9.0 maf
  • 700 kaf for annual releases of 9.0 maf to less than 10.0 maf
  • 800 kaf or greater for annual releases of 10.0 maf or greater; up to powerplant capacity for high equalization releases
  • Monthly Release Volumes will generally strive to maintain 600 kaf levels in the shoulder months (spring and fall) and 800 kaf in the December/January and July/August timeframe.
    • Additionally, the Bureau of Reclamation will continue to apply best professional judgment in conducting actual operations and in response to changing conditions throughout the water year. Such efforts will continue to be undertaken in coordination with the DOI/DOE agencies, and in consultation with the Basin States as appropriate, to consider changing conditions and adjust projected operations in a manner consistent with the objectives of these parameters as stated above and pursuant to the Law of the River.