==2007==
 
==2007==
−
*Pearce Ferry Rapid forms
+
*Pearce Ferry Rapid forms creating a non-navigable barrier for downstream rafting and barrier for upstream fish movement from Lake Mead
 
*[https://gcdamp.com/index.php/Interim_Guidelines Beginning of Interim Guidelines for Lower Basin Shortages (2007-2027)]
 
*[https://gcdamp.com/index.php/Interim_Guidelines Beginning of Interim Guidelines for Lower Basin Shortages (2007-2027)]
 
*[https://gcdamp.com/index.php/Strategic_Science_Plan Strategic Science Plan]
 
*[https://gcdamp.com/index.php/Strategic_Science_Plan Strategic Science Plan]

Revision as of 11:25, 29 September 2026


2027

  • LTEMP 10-Year Review

2026

2025

2024

  • Humpback chub population in Grand Canyon grows to 70,000 adults (40,000–200,000; 95% credible interval)
  • The LTEMP EIS is modified to allow for releases to control smallmouth bass and to modify the sediment accounting windows for HFEs
  • SEIS Bypass Releases (CoolMix) to control smallmouth bass

2023

2022

2021

2020

  • Bugflow Experiment
  • Brown trout incentivized harvest at Lees Ferry
  • COVID moves all meetings for the year to remote
  • Ed Keable becomes superintendent of Grand Canyon National Park

2019

2018

2017

2016

2015

2014

  • Fall HFE: 37,500 cfs for 96h
  • Galahad Point fire and flood eliminates the humpback chub translocation in Shinumo Creek

2013

  • Fall HFE: 34,100 cfs for 96h
  • Sally Jewell becomes Secretary of the Interior

2012

2011

2010

2009

2008

  • USFWS Biological Opinion identifies concerns with constructing a Temperature Control Device (TCD) that can only release warm water
  • Spring HFE
  • Grand Canyon Trust files suit against USBR, USFWS, and others contending operations at Glen Canyon Dam rand counter to their obligations to comply with the ESA, NEPA, and Administrative Policy Act
  • GCDAMP budget was capped

2007

2006

  • Trout removals from the confluence with the Little Colorado River (2003-2006)
  • Draft Long-Term Experimental Plan Environmental Plan (LTEP)
  • Dirk Kempthorne becomes Secretary of the Interior

2005

2004

2003

  • Trout removals from the confluence with the Little Colorado River (2003-2006)
  • Fluctuating trout suppression flows from January through March implemented and continued through 2005.

2002

  • U.S. Fish and Wildlife Service announces recovery goals for endangered fishes of the Colorado River Basin.
  • Adaptive Management Work Group recommends implementation of the first 2 years of an experimental design proposed by the GCMRC.

2001

  • Humpback Chub population in Grand Canyon was in decline in the 1990s, and reached a low of about 5,000 adult fish
  • Draft GCDAMP Strategic Plan for the developed by program managers.
  • Gale Norton becomes Secretary of the Interior
  • GCMRC moves from the office of the Assistant Secretary of the Interior to the US Geological Survey

2000

1999

1998

  • GCMRC is moved from USBR to the office of the Assistant Secretary of the Department of the Interior
  • Barry Gold becomes acting GCRMC Chief

1997

  • AMWG and TWG fully established
  • The AMWG held their first meeting on September 10-11, 1997, and officially formed the Glen Canyon Technical Work Group (TWG) as a subgroup to work on tasks charged to them by the AMWG.
  • The TWG was formed to provide stakeholders with involvement in federal decisions concerning the operation of Glen Canyon Dam and Power Plant.
  • Formation of a GCDAMP Strategic Planning Subcommittee (1997-2000)
  • Reclamation begins a Value Planning Study for a warm-water Temperature Control Device (TCD)
  • 1997 Habitat Maintenance Flow (HMF)
  • Mary Orton joins AMWG as mediator
  • Bruce Moore becomes program manager for the Glen Canyon Dam Adaptive Management Program

1996

  • Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement selects Modified Low Fluctuating Flows (MLFF) as the preferred alternative.
  • 1996 Beach/Habitat-Building Flow (BHBF)
  • Dave Garrett becomes first GCMRC Chief

1995

  • Transition Work Group to act as a bridge between GCES and GCDAMP (1995-1996)
  • Establishment of the Grand Canyon Monitoring and Research Center (GCMRC)
  • The Glen Canyon Dam Environmental Impact Statement as required by the Grand Canyon Protection Act is completed.
  • The Grand Canyon National Park General Management Plan

1994

  • Programmatic Agreement on Cultural Resources signed between the State of Arizona, Department of the Interior agencies, and six tribes over protection of cultural resources in the river corridor below Glen Canyon Dam.
  • U.S. Fish and Wildlife Service designates critical habitat for four species of endangered Colorado River fish and completes Biological Opinion outlining reasonable and prudent alternatives that must be evaluated for dam operation.
  • Memorandum of Agreement signed for development of a Lower Colorado River Multi-Species Conservation Plan between state agencies in Nevada, California, and Arizona and federal agencies, including the Bureau of Land Management, Bureau of Reclamation, Fish and Wildlife Service, and the National Park Service.MSCP History (SDSU)

1993

  • Bruce Babbitt becomes Secretary of the Interior
  • Dan Beard becomes USBR Commissioner

1992

1991

  • Interim operating criteria for Glen Canyon Dam implemented
  • The 1990-91 Experimental Flows
  • Razorback Sucker and Kanab Ambersnail federally listed as endangered

1990

  • Beginning of Interim Operating Criteria
  • The 1990-91 Experimental Flows
  • Formulative discussions on the concept of HFEs begin lead by Duncan Patton

1989

  • Manuel Lujan becomes Secretary of the Interior and orders an environmental impact statement on dam operations.
  • National Research Council sponsors symposium that reviews existing knowledge on Colorado River ecosystem

1988

  • Salt Lake City Area Integrated Projects(CRSP) passed after a series of public information and comment forums.
  • Glen Canyon Environmental Studies issues Glen Canyon Environmental Studies Final Report, completing Phase I and starting Phase II (1988-1988), which would be accelerated to support environmental impact statement process.

1987

1986

1985

1984

  • The 1984 Floods
  • One of the last Razorback Suckers seen in Grand Canyon is caught and released at Bass Rapids

1983

  • The 1983 Floods
  • Glen Canyon Dam releases more than 92,000 cfs to stop Lake Powell from overtopping Glen Canyon Dam.

1982

  • Glen Canyon Environmental Studies - Phase I (1982-1988) created to study effects of Glen Canyon Dam operations

1980

  • Lake Powell reaches full pool (3,700 ft)
  • Bonytail chub listed as endangered

1979

  • Grand Canyon National Park designated a UNESCO World Heritage Site
  • USBR proposes an upgrade of Glen Canyon Dam's generators

1978

  • U.S. Fish and Wildlife Service files jeopardy opinion on the effects of Glen Canyon Dam on endangered fishes

1975

  • Grand Canyon National Park Enlargement Act passed

1974

  • Colorado River Basin Salinity Control Act authorized the construction, operation, and maintenance of works in the Colorado River Basin to control the salinity of Colorado River water available for use in the United States and Mexico. Some GCDAMP stakeholders participate in the Salinity Control Forums created by the act.
  • First Lawsuit filed over Glen Canyon Dam operations by commercial raft operators contending that the disruption of normal flows was interfering with their ability to conduct river trips.

1973

  • Endangered Species Act (ESA) of 1973 passed to protect and promote the recovery of animals and plants that are in danger of becoming extinct because of the activities of people. Administered by the US Fish and Wildlife Service.

1972

1971

1970

1969

  • National Environmental Policy Act (NEPA) of 1969 passed requiring Federal agencies to consider the environmental impacts of their proposed actions and reasonable alternatives to those actions.

1968

  • Colorado River Basin Project Act passed

1967

  • Humpback chub and Colorado pikeminnow federally listed as endangered

1966

  • National Historic Preservation Act passed
  • Crystal rapid forms after a large flash flood from Crystal Creek

1965

1964

  • U.S. Supreme Court decision in Arizona v. California confirmed apportionments of Colorado River water authorized in 1928 Boulder Canyon Project Act, including Nevada's allocation of 0.3 maf per year. The Decree in this case set many of the rules under which the river is operated.

1963

  • Glen Canyon Dam completed as part of the Colorado River Storage Project.
  • U.S. Supreme Court held in Arizona vs California that, as a result of the Boulder Canyon Project Act, California held an allocation of 4.4 maf, Arizona 2.8 maf, and Nevada 300,000 acre-feet of Colorado River water

1956

  • Colorado River Storage Project Act passed authorizing Glen Canyon Dam

1948

  • Upper Colorado River Basin Compact signed

1944

  • Treaty with Mexico obligating the US to provide 1.5 maf of Colorado River water to Mexico annually

1935

  • Hoover Dam completed

1928

  • Boulder Canyon Project Act passed authorizing Hoover Dam.

1922

  • Colorado River Compact signed allocating the Colorado River water between the upper and the lower basins. Upper basin States have the right to use 7.5 maf/yr only if that quantity is available after meeting delivery requirements of 7.5 maf/yr to the Lower basin plus the amount required to satisfy anticipated claims by Mexico.

1921

1919

  • Grand Canyon National Park created

1916

  • National Park Service Organic Act passed

1902

  • Reclamation Act Creates the Bureau of Reclamation

1869

*11,000 BP

  • Paleo-Indian peoples occupy Grand Canyon region