Difference between revisions of "GCDAMP- HFE 2013"
From Glen Canyon Dam AMP
(add Possible Glen Canyon Dam HFE Release Pattern Pg 10.jpg) |
(add 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF) |
||
Line 17: | Line 17: | ||
== SUPPORTING DOCUMENTS == | == SUPPORTING DOCUMENTS == | ||
+ | *[[Media:131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF |131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment]] | ||
*[[Media:131022 Basin States Knowles.pdf |131022 Fall 2013 HFE Protocol Decision Process]] | *[[Media:131022 Basin States Knowles.pdf |131022 Fall 2013 HFE Protocol Decision Process]] | ||
*[[Media:131022 HFE Routing - start11th9AM.pdf |131022 2013 HFE Locations and dates of hydrograph routing]] | *[[Media:131022 HFE Routing - start11th9AM.pdf |131022 2013 HFE Locations and dates of hydrograph routing]] |
Revision as of 08:27, 28 October 2013
High Flow Experiment- 2013 | |
- HFE DETAILS -SUMMARY:
Contents
SUPPORTING DOCUMENTS
- 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment
- 131022 Fall 2013 HFE Protocol Decision Process
- 131022 2013 HFE Locations and dates of hydrograph routing
- 131022 System Overview to Basin States- USGS Schmidt
- 131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi
COMPLIANCE
- A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
- DOI consultation meeting with the Basin States_ October 22, 2013
TBD
TBD
- CRC 0020.JPG
Contributor: Category: Sediment, Recreation, Water delivery