Difference between revisions of "GCDAMP- HFE 2013"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add Possible Glen Canyon Dam HFE Release Pattern Pg 10.jpg)
(add 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF)
Line 17: Line 17:
  
 
== SUPPORTING DOCUMENTS ==
 
== SUPPORTING DOCUMENTS ==
 +
*[[Media:131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF |131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment]]
 
*[[Media:131022 Basin States Knowles.pdf |131022 Fall 2013 HFE Protocol Decision Process]]  
 
*[[Media:131022 Basin States Knowles.pdf |131022 Fall 2013 HFE Protocol Decision Process]]  
 
*[[Media:131022 HFE Routing - start11th9AM.pdf |131022 2013 HFE Locations and dates of hydrograph routing]]
 
*[[Media:131022 HFE Routing - start11th9AM.pdf |131022 2013 HFE Locations and dates of hydrograph routing]]

Revision as of 08:27, 28 October 2013

High Flow Experiment- 2013
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY:

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

TBD

TBD





Contributor: Category: Sediment, Recreation, Water delivery