Difference between revisions of "GCDAMP- HFE 2012"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add)
 
(add 2012 sand transport)
Line 27: Line 27:
 
*DOI consultation meeting with the Basin States_ October 22, 2013
 
*DOI consultation meeting with the Basin States_ October 22, 2013
  
== TBD ==
+
== SAND TRANSPORT caused by 2012 HFE ==
*
+
*@ RM30 = 390,000 metric tons
 +
*@ RM60 = 380,000 metric tons
 +
*@ RM87 = 540,000 metric tons
 +
*@ RM225 = 970,000 metric tons
 +
 
  
 
== TBD ==
 
== TBD ==

Revision as of 09:15, 28 October 2013

High Flow Experiment- 2012
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY: ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

SAND TRANSPORT caused by 2012 HFE

  • @ RM30 = 390,000 metric tons
  • @ RM60 = 380,000 metric tons
  • @ RM87 = 540,000 metric tons
  • @ RM225 = 970,000 metric tons


TBD





Contributor: Category: Sediment, Recreation, Water delivery