Difference between revisions of "GCDAMP- HFE 2013"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add)
(add hfe stats)
Line 12: Line 12:
 
}}
 
}}
 
*'''HFE DETAILS -SUMMARY:'''  
 
*'''HFE DETAILS -SUMMARY:'''  
*Sediment in the system:  1.5 Million metric tons
+
*Sediment in the system:  '''1.5 Million metric tons'''
 
*Starts on Monday, November 11, 2013
 
*Starts on Monday, November 11, 2013
*
+
*Estimated costs to WAPA Hydropower:  '''$1.74 million'''
 +
*Estimated acre feet of water bypassed during HFE:  '''approx. 129,000 af'''
 +
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
  
 
== SUPPORTING DOCUMENTS ==
 
== SUPPORTING DOCUMENTS ==

Revision as of 14:49, 28 October 2013

High Flow Experiment- 2013
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY:
  • Sediment in the system: 1.5 Million metric tons
  • Starts on Monday, November 11, 2013
  • Estimated costs to WAPA Hydropower: $1.74 million
  • Estimated acre feet of water bypassed during HFE: approx. 129,000 af
  • Hourly Releases before and after HFE: fluctuate between 5,000 to 8,000 cfs

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013.
  • Government to Government tribal consultation: Pueblo of Zuni_ September 10, 2013.
  • Government to Government tribal consultation: Navajo Nation_ September 11, 2013.

TBD

TBD





Contributor: Category: Sediment, Recreation, Water delivery