|
|
Line 11: |
Line 11: |
| <tr style='mso-yfti-irow:0;mso-yfti-firstrow:yes'> | | <tr style='mso-yfti-irow:0;mso-yfti-firstrow:yes'> |
| <td width=40% valign=bottom align=left style='width:2.05in;padding:0in 5.4pt 0in 5.4pt'> | | <td width=40% valign=bottom align=left style='width:2.05in;padding:0in 5.4pt 0in 5.4pt'> |
− | <p class=MsoNormal>[[File:2013-09 Glen Canyon Dam with lightning.jpg|820px]] | + | <p class=MsoNormal> |
| </p> | | </p> |
| </td> | | </td> |
| </tr> | | </tr> |
| + | [[File:2016 Releases (1).jpg|600px]] |
| + | |
| </table> | | </table> |
| <!-- | | <!-- |
Line 20: |
Line 22: |
| ------------Portal list on righthand side----------> | | ------------Portal list on righthand side----------> |
| |style="width:60%; font-size:100%;"| | | |style="width:60%; font-size:100%;"| |
− |
| |
| '''Current Operations''' | | '''Current Operations''' |
| | | |
Line 61: |
Line 62: |
| |- | | |- |
| |style="color:#000;"| | | |style="color:#000;"| |
− | [[File:File:2016 outage.jpg|400px]] | + | [[File:2016 outage.jpg|400px]] |
− | [[File:File:2017 outage.jpg|400px]] | + | [[File:2017 outage.jpg|400px]] |
| | | |
| |} | | |} |
|
Current Operations
The operating tier for water year 2016 was established in August 2015 as the Upper Elevation Balancing Tier. The April 2016 24-Month Study established that Lake Powell operations will be governed by balancing for the remainder of water year 2016. Under balancing, the contents of Lake Powell and Lake Mead will be balanced by the end of the water year, but not more than 9.0 maf and not less than 8.23 maf shall be released from Lake Powell. Based on the most probable inflow forecast, this May 24-Month Study projects a balancing release of 9.0 maf in water year 2016; the actual release in water year 2016, however, will depend on hydrology in the remainder of water year and will range from 8.23 to 9.0 maf. The projected release from Lake Powell in water year 2016 will be updated each month throughout the remainder of the water year. Reclamation will schedule operations at Glen Canyon Dam to achieve as practicably as possible the appropriate total annual release volume by September 30, 2016.
In May, the release volume will be approximately 700 kaf, with fluctuations anticipated between about 8,000 cfs in the nighttime to about 14,000 cfs in the daytime and consistent with the Glen Canyon Operating Criteria (Federal Register, Volume 62, No. 41, March 3, 1997). The anticipated release volume for June is 800 kaf with daily fluctuations between approximately 9,000 cfs and 17,000 cfs. The expected release for July is 950 kaf with daily fluctuations between approximately 11,500 cfs and 19,500 cfs.
|