Difference between revisions of "GCDAMP Budget"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 110: | Line 110: | ||
==Project 2. Stream Flow, Water Quality, and Sediment Transport in the Colorado River Ecosystem== | ==Project 2. Stream Flow, Water Quality, and Sediment Transport in the Colorado River Ecosystem== | ||
− | + | Investigators | |
− | + | Project Summary <br> | |
− | + | Background <br> | |
*Scientific Background | *Scientific Background | ||
*Management Background | *Management Background | ||
* Monitoring and Research Questions Posed by Stakeholders that Are Addressed in This Project | * Monitoring and Research Questions Posed by Stakeholders that Are Addressed in This Project | ||
*Scientific Questions that have Emerged from Past Work and That Are Addressed in This Project | *Scientific Questions that have Emerged from Past Work and That Are Addressed in This Project | ||
− | + | Proposed Work <br> | |
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY 13–14) <br> | |
*Data Products | *Data Products | ||
*Completed Publications | *Completed Publications | ||
Line 127: | Line 127: | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
* Presentations at professional meetings | * Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget <br> | |
==Project 3. Sandbars and Sediment Storage Dynamics: Long-term Monitoring and Research at the Site, Reach, and Ecosystem Scales== | ==Project 3. Sandbars and Sediment Storage Dynamics: Long-term Monitoring and Research at the Site, Reach, and Ecosystem Scales== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background <br> | |
*Scientific Background | *Scientific Background | ||
*Management Background | *Management Background | ||
*Key Monitoring and Research Questions Addressed in this project | *Key Monitoring and Research Questions Addressed in this project | ||
− | + | Proposed Work <br> | |
*Outline of Monitoring Strategy | *Outline of Monitoring Strategy | ||
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY 13–14) <br> | |
*Data Products | *Data Products | ||
*Completed Publications | *Completed Publications | ||
Line 148: | Line 148: | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
*Presentations at professional meetings | *Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget <br> | |
==Project 4. Connectivity along the fluvial-aeolian-hillslope continuum: Quantifying the relative importance of river-related factors that influence upland geomorphology and archaeological site stability == | ==Project 4. Connectivity along the fluvial-aeolian-hillslope continuum: Quantifying the relative importance of river-related factors that influence upland geomorphology and archaeological site stability == | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background <br> | |
*Scientific Background | *Scientific Background | ||
*Management Background | *Management Background | ||
*Key Monitoring and Research Questions Addressed in this project | *Key Monitoring and Research Questions Addressed in this project | ||
− | + | Proposed Work <br> | |
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY13–14) <br> | |
*Data Products | *Data Products | ||
*Completed Publications | *Completed Publications | ||
Line 168: | Line 168: | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
*Presentations at professional meetings | *Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget <br> | |
==Project 5. Foodbase Monitoring and Research== | ==Project 5. Foodbase Monitoring and Research== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background <br> | |
*Scientific Background | *Scientific Background | ||
*Management Background | *Management Background | ||
*Key Monitoring and Research Questions Addressed | *Key Monitoring and Research Questions Addressed | ||
*Hypotheses Explaining Aquatic Invertebrate Productivity and Diversity | *Hypotheses Explaining Aquatic Invertebrate Productivity and Diversity | ||
− | + | Proposed Work | |
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY 13–14) | |
*Data Product | *Data Product | ||
*Completed Publications | *Completed Publications | ||
Line 189: | Line 189: | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
*Presentations at professional meetings | *Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget | |
==Project 6. Mainstem Colorado River Humpback Chub Aggregations and Fish Community Dynamics== | ==Project 6. Mainstem Colorado River Humpback Chub Aggregations and Fish Community Dynamics== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
*Scientific Background | *Scientific Background | ||
*Key Monitoring and Research Questions Addressed in this project | *Key Monitoring and Research Questions Addressed in this project | ||
*Key management goals and objectives addressed in this project | *Key management goals and objectives addressed in this project | ||
− | + | Proposed Work | |
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY 13–14) | |
*Data Products | *Data Products | ||
*Publications in progress | *Publications in progress | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
*Presentations at professional meetings | *Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget | |
==Project 7. Population Ecology of Humpback Chub in and around the Little Colorado River== | ==Project 7. Population Ecology of Humpback Chub in and around the Little Colorado River== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
*Scientific Background | *Scientific Background | ||
*Management Background | *Management Background | ||
*Key Monitoring and Research Questions Addressed in this project | *Key Monitoring and Research Questions Addressed in this project | ||
− | + | Proposed Work | |
*Project Elements | *Project Elements | ||
*Personnel and Collaborations | *Personnel and Collaborations | ||
*Deliverables | *Deliverables | ||
− | + | Productivity from Past Work (during FY 13–14) | |
*Data Products | *Data Products | ||
*Completed Publications | *Completed Publications | ||
Line 228: | Line 228: | ||
*Presentations at GCDAMP meetings | *Presentations at GCDAMP meetings | ||
*Presentations at professional meetings | *Presentations at professional meetings | ||
− | + | References <br> | |
− | + | Budget | |
==Project 8. Experimental Actions to Increase Abundance and Distribution of Native Fishes in Grand Canyon== | ==Project 8. Experimental Actions to Increase Abundance and Distribution of Native Fishes in Grand Canyon== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Management Background | + | *Management Background |
− | *Key Monitoring and Research Questions Addressed in this Project | + | *Key Monitoring and Research Questions Addressed in this Project |
− | + | Proposed Work | |
− | *Project Elements | + | *Project Elements |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | Productivity from Past Work (during FY 13–14) | |
− | *Data Products | + | *Data Products |
− | *Publications in progress | + | *Publications in progress |
− | *Presentations at GCDAMP meetings | + | *Presentations at GCDAMP meetings |
− | *Presentations at professional meetings | + | *Presentations at professional meetings |
− | + | References <br> | |
− | + | Budget | |
− | Project 9. Understanding the Factors Determining Recruitment, Population Size, Growth, and Movement of Rainbow Trout in Glen and Marble Canyons == | + | ==Project 9. Understanding the Factors Determining Recruitment, Population Size, Growth, and Movement of Rainbow Trout in Glen and Marble Canyons == |
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Scientific Background | + | *Scientific Background |
− | *Key Monitoring and Research Questions Addressed in this Project | + | *Key Monitoring and Research Questions Addressed in this Project |
− | + | Proposed Work- Monitoring and Research Projects | |
− | *Project Elements- Research | + | *Project Elements- Research |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | Productivity from Past Work (during FY 13–14) | |
− | *Completed Publications | + | *Completed Publications |
− | *Publications in progress | + | *Publications in progress |
− | *Presentations at GCDAMP meetings | + | *Presentations at GCDAMP meetings |
− | *Presentations at professional meetings | + | *Presentations at professional meetings |
− | + | References <br> | |
− | + | Budget | |
==Project 10. Where does the Glen Canyon Dam rainbow trout tailwater fishery end? - Integrating Fish and Channel Mapping Data below Glen Canyon Dam == | ==Project 10. Where does the Glen Canyon Dam rainbow trout tailwater fishery end? - Integrating Fish and Channel Mapping Data below Glen Canyon Dam == | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Scientific Background | + | *Scientific Background |
− | *Management Background | + | *Management Background |
− | *Key Monitoring and Research Questions Addressed in this project | + | *Key Monitoring and Research Questions Addressed in this project |
− | + | Proposed Work | |
− | *Project Elements | + | *Project Elements |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | Productivity from Past Work (during FY 13–14) | |
− | *Data Products | + | *Data Products |
− | *Completed Publications | + | *Completed Publications |
− | *Publications in progress | + | *Publications in progress |
− | *Presentations at GCDAMP meetings | + | *Presentations at GCDAMP meetings |
− | *Presentations at professional meetings | + | *Presentations at professional meetings |
− | + | References <br> | |
− | + | Budget | |
==Project 11. Riparian Vegetation Monitoring and Analysis of Riparian Vegetation, Landform Change and Aquatic-Terrestrial linkages to Faunal Communities == | ==Project 11. Riparian Vegetation Monitoring and Analysis of Riparian Vegetation, Landform Change and Aquatic-Terrestrial linkages to Faunal Communities == | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Scientific Background | + | *Scientific Background |
− | *Management Background | + | *Management Background |
− | *Key Monitoring and Research Questions Addressed in this project | + | *Key Monitoring and Research Questions Addressed in this project |
− | + | Proposed Work | |
− | *Project Elements | + | *Project Elements |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | Productivity from Past Work (during FY 13–14) | |
− | *Data Products | + | *Data Products |
− | *Completed Publications | + | *Completed Publications |
− | *Publications in progress | + | *Publications in progress |
− | *Presentations at GCDAMP meetings | + | *Presentations at GCDAMP meetings |
− | *Presentations at professional meetings | + | *Presentations at professional meetings |
− | + | References <br> | |
− | + | Budget | |
− | ==Project 12. Changes in the Distribution and Abundance of Culturally-Important Plants in the Colorado River Ecosystem: A Pilot Study to Explore Relationships between Vegetation Change and Traditional Cultural | + | ==Project 12. Changes in the Distribution and Abundance of Culturally-Important Plants in the Colorado River Ecosystem: A Pilot Study to Explore Relationships between Vegetation Change and Traditional Cultural Values== |
− | Values== | + | Investigators <br> |
− | + | Project Summary <br> | |
− | + | Background | |
− | + | *Scientific Background | |
− | *Scientific Background | + | *DFCs and Key Monitoring and Research Questions Addressed by this project |
− | *DFCs and Key Monitoring and Research Questions Addressed by this project | + | Proposed Work |
− | + | *Project Elements | |
− | *Project Elements | + | *Personnel and Collaborations |
− | *Personnel and Collaborations | + | *Linkages to other projects |
− | *Linkages to other projects | + | *Deliverables |
− | *Deliverables | + | References <br> |
− | + | Budget | |
− | + | ||
==Project 13. Socioeconomic Monitoring and Research== | ==Project 13. Socioeconomic Monitoring and Research== | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Scientific Background | + | *Scientific Background |
− | *Key Monitoring and Research Questions Addressed in this project | + | *Key Monitoring and Research Questions Addressed in this project |
− | + | Proposed Work | |
− | *Project Elements | + | *Project Elements |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | References <br> | |
− | + | Budget | |
==Project 14. Geographic Information Systems (GIS) Services and Support == | ==Project 14. Geographic Information Systems (GIS) Services and Support == | ||
− | + | Investigators <br> | |
− | + | Project Summary <br> | |
− | + | Background | |
− | *Scientific Background | + | *Scientific Background |
− | *Management Background | + | *Management Background |
− | *Key Monitoring and Research Questions Addressed in this project | + | *Key Monitoring and Research Questions Addressed in this project |
− | + | Proposed Work | |
− | *Project Elements | + | *Project Elements |
− | *Personnel and Collaborations | + | *Personnel and Collaborations |
− | *Deliverables | + | *Deliverables |
− | + | Productivity from Past Work (during FY 13–14) | |
− | *Data Products | + | *Data Products |
− | *Presentations at GCDAMP meetings | + | *Presentations at GCDAMP meetings |
− | *Presentations at professional meetings | + | *Presentations at professional meetings |
− | + | Budget | |
− | + | ||
==Project 15. Administration== | ==Project 15. Administration== |
Revision as of 16:02, 21 July 2016
|
The goal of the Triennial Workplan and Budget (TWP) is to reduce the effort expended on the budget process while improving the effectiveness of the Grand Canyon Monitoring and Research Center (GCMRC), Technical Work Group (TWG), and AMWG. The GCDAMP will develop a TWP the first year of the process. Then, in the second year the GCDAMP would implement the year-two budget and make relatively minor corrections primarily related to changes in CPI and needs at GCMRC and the Bureau of Reclamation. In the third year the GCDAMP would consider minor changes to the year three budget to allow for changes in projects or potential important new starts not envisioned during the development of the triennial budget. The major components of the TWP would include:
|
GCDAMP Strategic Plan The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. |
Strategic Science Plan The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next 5 years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
Core Monitoring Plan The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. |
Monitoring and Research Plan The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next 5 years to address some of the strategic science questions associated with AMWG priority questions. |
Triennial Work Plan (TWP) The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
---|
|