Difference between revisions of "GCDAMP Glen Canyon Dam"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 72: | Line 72: | ||
*[[Media:GCD Operating Criteria 1997.pdf| 1997 Operating Criteria for Glen Canyon Dam]] | *[[Media:GCD Operating Criteria 1997.pdf| 1997 Operating Criteria for Glen Canyon Dam]] | ||
− | *[https://www.usbr.gov/lc/region/programs/strategies.html | + | *[https://www.usbr.gov/lc/region/programs/strategies.html 2007 Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead] |
|- | |- |
Revision as of 14:35, 14 March 2017
|
Operations of Glen Canyon DamThe operating tier for water year 2017, established in August 2016, is the Upper Elevation Balancing Tier, with an initial water year release volume of 8.23 maf and the potential for an April 2017 adjustment to equalization or balancing releases. Based on the current forecast, an April adjustment to balancing releases is projected to occur and Lake Powell is currently projected to release 9.0 maf in water year 2017. This projection will be updated each month throughout the water year. [1] |
--- | --- | --- |
---|
|
|