Difference between revisions of "The 2019 Fall HFE"

From Glen Canyon Dam AMP
Jump to: navigation, search
Line 14: Line 14:
  
 
== 2019 High Flow Experiment Snapshot ==
 
== 2019 High Flow Experiment Snapshot ==
*A 2019 HFE was not conducted for lack of adequate sediment input from the Paria River
+
*A 2019 Fall HFE was not conducted for lack of adequate sediment input from the Paria River
  
 
==Sediment Conditions==
 
==Sediment Conditions==

Revision as of 10:10, 21 July 2021

High Flow Experiment- 2019
CRC 121119 0038.JPG

2019 High Flow Experiment Snapshot

  • A 2019 Fall HFE was not conducted for lack of adequate sediment input from the Paria River

Sediment Conditions

Fall Accounting Period

  • Paria input (Jul 1 - Nov 30): 52,711
  • Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) = -190,000
  • Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) = -150,000
  • Available for HFE: -190,000 + -150,000 = -40,000

Winter Accounting Period

  • Paria input (Dec 1 to Apr 1): 50,737
  • Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Available for spring HFE:

SUPPORTING DOCUMENTS

COMPLIANCE

CONCERNS

ADDITIONAL