| − | ==Glen Canyon Environmental Studies== | + | ==Glen Canyon Environmental Studies - Phase I (1982-1988)== |
While the National Park Service, Native Americans, river runners, and scientists had noticed that some beaches were disappearing and that plant and animal life along the Colorado River were | While the National Park Service, Native Americans, river runners, and scientists had noticed that some beaches were disappearing and that plant and animal life along the Colorado River were | ||
changing since Glen Canyon Dam was completed in 1963, the Glen Canyon Environmental Studies program of the Bureau of Reclamation was the first systematic effort to investigate the effects of dam operations on downstream resources. The program began in 1982 and lasted through 1996. The Glen Canyon Environmental Studies did identify a mix of positive and negative consequences of dam operations on the downstream environment. In response to | changing since Glen Canyon Dam was completed in 1963, the Glen Canyon Environmental Studies program of the Bureau of Reclamation was the first systematic effort to investigate the effects of dam operations on downstream resources. The program began in 1982 and lasted through 1996. The Glen Canyon Environmental Studies did identify a mix of positive and negative consequences of dam operations on the downstream environment. In response to | ||
substantial public concern over the findings of the Glen Canyon Environmental Studies, in 1989 the Secretary of the Interior announced that an environmental impact statement would be completed to evaluate the operation of Glen Canyon Dam. With this announcement, the Glen Canyon Environmental Studies focused on providing specific data for use in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995). [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | substantial public concern over the findings of the Glen Canyon Environmental Studies, in 1989 the Secretary of the Interior announced that an environmental impact statement would be completed to evaluate the operation of Glen Canyon Dam. With this announcement, the Glen Canyon Environmental Studies focused on providing specific data for use in the Glen Canyon Dam Environmental Impact Statement (Reclamation 1995). [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | ||
| − | ==Grand Canyon Protection Act== | + | ==Glen Canyon Environmental Studies - Phase II (1988-1988)== |
| + | |||
| + | ==National Research Council workshop on Colorado River (1989)== | ||
| + | |||
| + | ==Formative discussions on the concept for HFEs (1990-1995)== | ||
| + | |||
| + | ==Studies of discharge patterns and river flows (1990-1991)== | ||
| + | |||
| + | ==Beginning of Interim Operating Criteria (1991)== | ||
| + | |||
| + | ==Grand Canyon Protection Act (1992)== | ||
The Grand Canyon Protection Act (Appendix A) was enacted on October 30, 1992. Section | The Grand Canyon Protection Act (Appendix A) was enacted on October 30, 1992. Section | ||
1802 states: | 1802 states: | ||
| Line 61: | Line 71: | ||
The Secretary of the Interior was also directed to establish and implement long-term monitoring programs and activities to ensure that Glen Canyon Dam is operated in a manner consistent with the Grand Canyon Protection Act. These programs include necessary research and studies to determine the effect of management of the dam on the natural, recreational, and cultural downstream resources. These actions will also be undertaken in consultation with other federal agencies, the Governors of the Basin States, Indian Tribes, and the general public, including representatives of academic and scientific communities, environmental organizations, the recreation industry, and contractors for the purchase of federal power produced at Glen Canyon Dam. To accomplish these requirements, the Glen Canyon Dam Adaptive Management Program was established. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | The Secretary of the Interior was also directed to establish and implement long-term monitoring programs and activities to ensure that Glen Canyon Dam is operated in a manner consistent with the Grand Canyon Protection Act. These programs include necessary research and studies to determine the effect of management of the dam on the natural, recreational, and cultural downstream resources. These actions will also be undertaken in consultation with other federal agencies, the Governors of the Basin States, Indian Tribes, and the general public, including representatives of academic and scientific communities, environmental organizations, the recreation industry, and contractors for the purchase of federal power produced at Glen Canyon Dam. To accomplish these requirements, the Glen Canyon Dam Adaptive Management Program was established. [http://www.riversimulator.org/Resources/GCDAMP/GCDAMPchronicle/StrategicPlanGCDamp2001.pdf] | ||
| − | ==Glen Canyon Dam Environmental Impact Statement== | + | ==Glen Canyon Dam Environmental Impact Statement (1995)== |
The Glen Canyon Dam Environmental Impact Statement (Reclamation 1995) was completed in | The Glen Canyon Dam Environmental Impact Statement (Reclamation 1995) was completed in | ||
March 1995. Its purpose was to “determine specific options that could be implemented to | March 1995. Its purpose was to “determine specific options that could be implemented to | ||
| Line 71: | Line 81: | ||
preferred alternative was the Modified Low Fluctuating Flow Alternative. | preferred alternative was the Modified Low Fluctuating Flow Alternative. | ||
| − | ==Record of Decision on the Operation of Glen Canyon Dam== | + | ==Establishment of the Grand Canyon Monitoring and Research Center (1995)== |
| + | |||
| + | ==Transition Work Group (1995-1996)== | ||
| + | The informal group was assembled to act as a bridge between GCES and GCDAMP personnel and methods. It was comprised mostly of soon-to-be GCDAMP stakeholders. | ||
| + | |||
| + | ==Record of Decision on the Operation of Glen Canyon Dam (1996)== | ||
On October 9, 1996, the Secretary of the Interior signed the Record of Decision that presented | On October 9, 1996, the Secretary of the Interior signed the Record of Decision that presented | ||
the rationale for choosing the Modified Low Fluctuating Flow Alternative. As noted in the Record of Decision: | the rationale for choosing the Modified Low Fluctuating Flow Alternative. As noted in the Record of Decision: | ||
| Line 98: | Line 113: | ||
Group 1998) with Endangered Species Act and National Environmental Policy Act compliance. | Group 1998) with Endangered Species Act and National Environmental Policy Act compliance. | ||
| − | == | + | ==Strategic Planning Subcommittee (1997-2000)== |
| − | + | Formed at the behest of SOI Bruce Babbitt for the transition from GCES to GCDAMP/AMWG. There were seven members, representing recreation, environmental, tribal, hydropower and Department of the Interior interests. According to Andre Potochnik, it was this group that took the Colorado River trip described in detail by Mary Orton (see 1999, below). | |
| − | + | ||
| − | + | ==AMWG and TWG fully established (1997)== | |
| − | + | In 1997 Secretary of Interior Bruce Babbitt established the Glen Canyon Dam Adaptive Management Work Group (AMWG) as a formal Federal Advisory Committee, under the authority and guidelines of the Federal Advisory Committee Act of 1972. The purpose of AMWG was to monitor implementation of the ROD, provide recommendations to the Secretary regarding its effectiveness, and recommend science-based adjustments to the operation of Glen Canyon Dam to better achieve restoration and maintenance of downstream resources. AMWG held its first meeting on September 10-11, 1997, and officially formed the Glen Canyon Technical Work Group (TWG) as a subgroup to work on tasks charged to them by the AMWG. | |
| − | + | ||
| − | + | ==AMWG Colorado River trip (1999)== | |
| − | + | As described in Mary Orton’s oral history interview, this trip through Grand Canyon helped soothe contention among AMWG stakeholders, who had not been working together for very long, and resulted in a Vision Statement for the group. Most oral history interviewees involved in GCDAMP at the time have shared a recollection of the trip or its impact on the program. | |
| − | + | ||
| − | + | ==Publication of first GCDAMP Strategic Plan (2001)== | |
| − | + | “This strategic plan is a guidance document for the Glen Canyon Dam Adaptive Management Program and was developed by program members. Elements of this plan include the Glen Canyon Dam Adaptive Management Work Group’s vision and mission statements, as well as principles, goals, and management objectives.” (From the Foreword to the Stategic Plan) | |
| − | + | ||
| − | + | ==Experimental design initiated (2002)== | |
| + | Adaptive Management Work Group recommends implementation of the first 2 years of an experimental design proposed by the GCMRC. | ||
| − | + | ==Experimental fish programs launched (2003)== | |
| − | + | Experiment begun to remove nonnative fish from the Colorado River in Grand Canyon. Fluctuating nonnative fish suppression releases from January through March implemented and continued through 2005. | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ==First High Flow Experiment under a new HFE Protocol (2012)== | |
| − | + | “Secretary of the Interior Ken Salazar triggered the first release under the experimental long-term protocol in November 2012. The protocol calls for conducting more frequent high-flow experimental releases and timing them to occur following sediment inputs to the Colorado River downstream from Glen Canyon Dam.” | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | == | + | ==LTEMP EIS (2016)== |
| − | + | LTEMP “provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years.” | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
|} | |} | ||
Revision as of 12:15, 18 September 2026
|
|
History of the Glen Canyon Dam Adaptive Management ProgramThe Secretary of the Interior Bruce Babbitt, created the Glen Canyon Dam Adaptive Management Program (GCDAMP) in response to the 1995 Environmental Impact Statement on the Operations of Glen Canyon Dam. The GCDAMP is responsible for implementation of the Grand Canyon Protection Act of 1992, to monitor the operation of Glen Canyon Dam, to ensure the dam is operated in compliance with a range of laws and regulations and mitigate any significant environmental impacts. [1] |
| -- |
-- |
-- |
|---|
|
|