Difference between revisions of "HYDROPOWER"
From Glen Canyon Dam AMP
(add hydropower link) |
(add) |
||
Line 58: | Line 58: | ||
===''Associated Ad-Hoc Group''=== | ===''Associated Ad-Hoc Group''=== | ||
− | + | ||
===''TBD''=== | ===''TBD''=== | ||
Line 80: | Line 80: | ||
* Temperature: Year round temperatures of '''45 degrees F to 50 degrees F'''. | * Temperature: Year round temperatures of '''45 degrees F to 50 degrees F'''. | ||
* Since the signing of the final operating criteria in February 1997, powerplant releases do not exceed 25,000 cfs, other than during HFE's or emergency situations, and have most often averaged between 10,000 cfs and 20,000 cfs. | * Since the signing of the final operating criteria in February 1997, powerplant releases do not exceed 25,000 cfs, other than during HFE's or emergency situations, and have most often averaged between 10,000 cfs and 20,000 cfs. | ||
− | *[http://www.usbr.gov/uc/rm/crsp/gc/faq.html] | + | *[http://www.usbr.gov/uc/rm/crsp/gc/faq.html '''LINK''' to USBR GCD facts] |
[[File:USBR- Q& A on GCD Hydropower.jpg|450px|lect|USBR- Q& A on GCD Hydropower]] | [[File:USBR- Q& A on GCD Hydropower.jpg|450px|lect|USBR- Q& A on GCD Hydropower]] | ||
Revision as of 15:36, 8 March 2013
|
Definition of what Hydropower page contains TBD
|
TBD (Motions) |
TBD (TBD) |
TBD (TBD) |
---|
|
|