Difference between revisions of "GCDAMP- Hydrograph"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add)
(add link)
Line 36: Line 36:
 
== 2011 ==
 
== 2011 ==
 
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07b.pdf AMWG- August 2010- '''Hydrograph 2011''']
 
*[http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07b.pdf AMWG- August 2010- '''Hydrograph 2011''']
*Proposed Water year 2011 Hydrograph: Impacts on CRSP Electric Power Resources [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07e.pdf Attachment 7f]  
+
*Proposed Water year 2011 Hydrograph: Impacts on CRSP Electric Power Resources [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07e.pdf ]  
*Grand Canyon Trust '''Hydrograph Proposal 2011'''  
+
*Grand Canyon Trust '''Hydrograph Proposal 2011''' [http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10aug24/Attach_07f.pdf Attachment 7f]
  
  

Revision as of 16:34, 9 July 2013

Hydrograph Learning Page
CRC 121119 0038.JPG
  • PURPOSE of HYDROGRAPH:
  • Develop recommendations for operational hydrographs based on anticipated possible annual release volumes from Glen Canyon Dam consistent with Section 1802 of the Grand Canyon Protection Act.
  • The operational hydrographs are within the framework of the 1996 ROD and MLFF operation, consistent with balancing other resources, including power production, and recognize the variability of possible annual release volumes from Glen Canyon Dam under the 2007 Interim Guidelines.
  • HYDROGRAPH CONCEPT:
  • Apply sound science principles within the framework of adaptive management to adjust the timing of water deliveries to protect and restore flow-dependent resource conditions.


2014

2013


2012

  • TBD

2011



Contributor: Category: Water delivery