Difference between revisions of "GCDAMP- GTMAX"

From Glen Canyon Dam AMP
Jump to: navigation, search
(add gtmax final product)
(purpose of gt max)
Line 15: Line 15:
 
*GTMax stands for Generation and Transmission Maximization
 
*GTMax stands for Generation and Transmission Maximization
 
*WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S.
 
*WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S.
 +
 +
----
 +
'''PURPOSE OF GT MAX RELATED TO GCDAMP'''
 +
#Tool used to assist Western in making its operation of the CRSP powerplants more efficient
 +
#To estimate the electrical power production impacts of different operational regimes.
  
  

Revision as of 11:53, 12 July 2013

GT MAX
GTMAX- Screen-PIC.jpg
  • GTMax: A model used to analyze deregulated power market issues
  • GTMax stands for Generation and Transmission Maximization
  • WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S.

PURPOSE OF GT MAX RELATED TO GCDAMP

  1. Tool used to assist Western in making its operation of the CRSP powerplants more efficient
  2. To estimate the electrical power production impacts of different operational regimes.



ADDITIONAL ITEMS

Contributor: Leslie James Category: Hydropower