Difference between revisions of "GCDAMP- GTMAX"
From Glen Canyon Dam AMP
(add gtmax final product) |
(purpose of gt max) |
||
| Line 15: | Line 15: | ||
*GTMax stands for Generation and Transmission Maximization | *GTMax stands for Generation and Transmission Maximization | ||
*WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S. | *WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S. | ||
| + | |||
| + | ---- | ||
| + | '''PURPOSE OF GT MAX RELATED TO GCDAMP''' | ||
| + | #Tool used to assist Western in making its operation of the CRSP powerplants more efficient | ||
| + | #To estimate the electrical power production impacts of different operational regimes. | ||
Revision as of 12:53, 12 July 2013
| GT MAX | |
| |
- GTMax: A model used to analyze deregulated power market issues
- GTMax stands for Generation and Transmission Maximization
- WAPA, USBR, FWS, use GTMax to analyze the economics of hydropower systems in the Western U.S.
PURPOSE OF GT MAX RELATED TO GCDAMP
- Tool used to assist Western in making its operation of the CRSP powerplants more efficient
- To estimate the electrical power production impacts of different operational regimes.
ADDITIONAL ITEMS
Contributor: Leslie James Category: Hydropower