Line 13: | Line 13: | ||
*'''HFE DETAILS -SUMMARY:''' | *'''HFE DETAILS -SUMMARY:''' | ||
*Sediment in the system: '''1.5 Million metric tons''' | *Sediment in the system: '''1.5 Million metric tons''' | ||
− | *Starts on Monday, November | + | *Starts on Monday, November 11th and ends November 16th |
*Estimated costs to WAPA Hydropower: '''$1.74 million''' | *Estimated costs to WAPA Hydropower: '''$1.74 million''' | ||
*Estimated acre feet of water bypassed during HFE: '''approx. 129,000 af''' | *Estimated acre feet of water bypassed during HFE: '''approx. 129,000 af''' |
Revision as of 14:50, 28 October 2013
High Flow Experiment- 2013 | |
- HFE DETAILS -SUMMARY:
- Sediment in the system: 1.5 Million metric tons
- Starts on Monday, November 11th and ends November 16th
- Estimated costs to WAPA Hydropower: $1.74 million
- Estimated acre feet of water bypassed during HFE: approx. 129,000 af
- Hourly Releases before and after HFE: fluctuate between 5,000 to 8,000 cfs
Contents
SUPPORTING DOCUMENTS
- 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment
- 131022 Fall 2013 HFE Protocol Decision Process
- 131022 2013 HFE Locations and dates of hydrograph routing
- 131022 System Overview to Basin States- USGS Schmidt
- 131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi
COMPLIANCE
- A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
- DOI consultation meeting with the Basin States_ October 22, 2013.
- Government to Government tribal consultation: Pueblo of Zuni_ September 10, 2013.
- Government to Government tribal consultation: Navajo Nation_ September 11, 2013.
TBD
TBD