Difference between revisions of "GCDAMP- HFE 2016"

From Glen Canyon Dam AMP
Jump to: navigation, search
(Created page with " == SUMMARY == {{Infobox Person |name = High Flow Experiment- 2016 |image = CRC 121119 0038.JPG ‎ |alma_mater = |Job Title = November 7-11 |Previous_T...")
 
Line 16: Line 16:
  
 
*'''HFE DETAILS -SUMMARY:'''  
 
*'''HFE DETAILS -SUMMARY:'''  
 +
*Sediment in the system:  '''TBD'''
 +
*Peak CFS:  '''35,100 cfs'''
 +
*Estimated costs to hydropower:  '''TBD'''
 +
*Actual costs to hydropower:  '''TBD'''
 +
*Estimated acre feet of water bypassed during HFE:  '''125 kaf'''
 +
*Hourly Releases before and after HFE:  fluctuate between '''5,000 to 8,000 cfs'''
 +
*Direct expenses for removal of concession assets:  '''TBD'''
 +
*Units available: '''TBD'''
 +
*Powerplant capacity = '''20,100 cfs'''
 +
*November volume = '''649 kaf'''
 +
*Start Upramp: '''TBD'''
 +
*Finish HFE: '''TBD''' 
 +
*Total HFE duration:  '''96 hrs'''
 +
*HFE 2016 represents the 4th controlled high flow release conducted under the HFE Protocol.
  
 
== SUPPORTING DOCUMENTS ==
 
== SUPPORTING DOCUMENTS ==
Line 22: Line 36:
  
 
== CONCERNS ==
 
== CONCERNS ==
 +
*[[Media:Katrina 2016 HFE final 10-13-16.pdf| Angler's concerns regarding a Fall 2016 High flow experiment]]
 +
*[http://gcdamp.com/index.php?title=Green_Sunfish_Page Re-emergence of green sunfish in the -12 Mile Slough]
 +
*[http://www.usbr.gov/uc/rm/amp/twg/mtgs/16jan26/documents/Attach_05.pdf Increase in brown trout spawning in the Lees Ferry reach since the beginning of the HFE Protocol]
  
 
== SEDIMENT ==
 
== SEDIMENT ==

Revision as of 11:40, 14 October 2016

SUMMARY

High Flow Experiment- 2016
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY:
  • Sediment in the system: TBD
  • Peak CFS: 35,100 cfs
  • Estimated costs to hydropower: TBD
  • Actual costs to hydropower: TBD
  • Estimated acre feet of water bypassed during HFE: 125 kaf
  • Hourly Releases before and after HFE: fluctuate between 5,000 to 8,000 cfs
  • Direct expenses for removal of concession assets: TBD
  • Units available: TBD
  • Powerplant capacity = 20,100 cfs
  • November volume = 649 kaf
  • Start Upramp: TBD
  • Finish HFE: TBD
  • Total HFE duration: 96 hrs
  • HFE 2016 represents the 4th controlled high flow release conducted under the HFE Protocol.

SUPPORTING DOCUMENTS

COMPLIANCE

CONCERNS

SEDIMENT

ADDITIONAL