Difference between revisions of "The 2018 Fall HFE"
From Glen Canyon Dam AMP
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
Line 2: | Line 2: | ||
{{Infobox Person | {{Infobox Person | ||
|name = High Flow Experiment- 2018 | |name = High Flow Experiment- 2018 | ||
− | |image = | + | |image = 2018HFE_lights.jpg |
|alma_mater = | |alma_mater = | ||
− | |Job Title = November | + | |Job Title = November 5-8 |
|Previous_Title_ = | |Previous_Title_ = | ||
|Previous_Title_ = | |Previous_Title_ = | ||
Line 34: | Line 34: | ||
*Available for spring HFE: | *Available for spring HFE: | ||
− | == SUPPORTING DOCUMENTS == | + | ==HFE Details== |
+ | '''Schedule & Duration''' | ||
+ | *Nov. 5 - 6:00 a.m. begin upramp to powerplant capacity (~23,100 cfs) [7 generation units] | ||
+ | *Nov. 5 - 11:00 a.m. open bypass tubes, reach full bypass at 2:00 p.m. | ||
+ | *Nov. 8 - 9:00 a.m. end of bypass | ||
+ | *Nov. 8 - 3:00 p.m. end of High Flow Experiment | ||
+ | *Total duration: 3 days & 10 hours; 2 ½ days at peak release (60 hours) | ||
+ | |||
+ | '''Ramp Rates''' | ||
+ | *Ramp up: 4,000 cfs/hr from 6,500 - 23,100 cfs, then 3,750 cfs/hr to peak (38,100 cfs) | ||
+ | *Ramp down: 1,875 cfs/hr from 38,100 – 23,100 cfs, then 2,500 cfs/hr to 9,000 cfs | ||
+ | |||
+ | '''HFE Release Details'''[[File:2018HFE.jpg|thumb|right|400px|https://www.usbr.gov/uc/rm/gcdHFE/]] | ||
+ | *Maximum total release: 38,100 cfs | ||
+ | *Powerplant capacity: 23,100 cfs | ||
+ | *River outlet tubes: 15,000 cfs | ||
+ | *Hydropower generation units available: 7 (one unit off-line for replacement) | ||
+ | *River outlet tubes: 4 | ||
+ | |||
+ | '''Releases and Lake Elevation''' | ||
+ | *Releases will range from 6,500 - 9,000 cfs prior to and after the HFE | ||
+ | *Lake elevation is projected to decrease by approximately 7 inches during the 3-day experiment | ||
+ | |||
+ | '''Costs''' | ||
+ | *Estimated costs to hydropower: '''TBD''' | ||
+ | *Actual costs to hydropower: '''TBD''' | ||
+ | *Direct expenses for removal of concession assets: '''TBD''' | ||
+ | |||
+ | == SUPPORTING DOCUMENTS == [[File:2018HFE_traveltime.jpg|thumb|right|400px|https://www.usbr.gov/uc/rm/gcdHFE/]] | ||
+ | *[https://www.usbr.gov/uc/rm/gcdHFE/pdfs/20181018%20DOI%20HFE%20Decision%20Memo_ASWS%20Signed_with%20attachments.pdf 2018 High Flow Experimental Release Decision Memorandum] | ||
== COMPLIANCE == | == COMPLIANCE == | ||
+ | *[https://www.usbr.gov/newsroom/newsrelease/detail.cfm?RecordID=63503 Interior Initiates High-Flow Experiment at Glen Canyon Dam] | ||
+ | *[https://www.usbr.gov/newsroom/newsrelease/detail.cfm?RecordID=63424 Media Advisory: High-Flow Experiment at Glen Canyon Dam] | ||
== CONCERNS == | == CONCERNS == | ||
Line 42: | Line 73: | ||
== ADDITIONAL == | == ADDITIONAL == | ||
*[https://www.azcentral.com/story/news/local/arizona-environment/2018/11/05/grand-canyon-flooded-high-flow-experiment-colorado-river-federal-officials-glen-canyon-dam-lake-mead/1861287002/ AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River] | *[https://www.azcentral.com/story/news/local/arizona-environment/2018/11/05/grand-canyon-flooded-high-flow-experiment-colorado-river-federal-officials-glen-canyon-dam-lake-mead/1861287002/ AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River] | ||
+ | *[https://www.youtube.com/watch?v=H3UIW_KZddg&feature=youtu.be Lighted bypass tube video] | ||
+ | *[https://www.youtube.com/watch?v=bchH2m80Y3g Colorado River Pearce Ferry Rapid After High Flow Release From Glen Canyon Dam] | ||
<center> | <center> |
Revision as of 11:51, 19 November 2018
High Flow Experiment- 2018 | |
Contents
2018 High Flow Experiment Snapshot
Sediment Conditions
Fall Accounting Period
- Paria input (Jul 1 - Sept 21): 709,000
- Accumulated in Upper Marble Canyon (Jul 1 - Sept 4, lower bound) = 238,000
- Accumulated in Lower Marble Canyon (Jul 1 - Sept 4, lower bound) = 84,000
- Available for HFE: 238,000 + 84,000 = 322,000
HFE Transport
- Paria input (Nov 5 - 10):
- Evacuated from Upper Marble Canyon (Nov 5 - 10, lower bound) =
- Evacuated from Lower Marble Canyon (Nov 5 - 10, lower bound) =
- Left over in Marble Canyon after HFE (Nov 5 - 10):
Winter Accounting Period
- Paria input (Nov 11 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for spring HFE:
HFE Details
Schedule & Duration
- Nov. 5 - 6:00 a.m. begin upramp to powerplant capacity (~23,100 cfs) [7 generation units]
- Nov. 5 - 11:00 a.m. open bypass tubes, reach full bypass at 2:00 p.m.
- Nov. 8 - 9:00 a.m. end of bypass
- Nov. 8 - 3:00 p.m. end of High Flow Experiment
- Total duration: 3 days & 10 hours; 2 ½ days at peak release (60 hours)
Ramp Rates
- Ramp up: 4,000 cfs/hr from 6,500 - 23,100 cfs, then 3,750 cfs/hr to peak (38,100 cfs)
- Ramp down: 1,875 cfs/hr from 38,100 – 23,100 cfs, then 2,500 cfs/hr to 9,000 cfs
- Maximum total release: 38,100 cfs
- Powerplant capacity: 23,100 cfs
- River outlet tubes: 15,000 cfs
- Hydropower generation units available: 7 (one unit off-line for replacement)
- River outlet tubes: 4
Releases and Lake Elevation
- Releases will range from 6,500 - 9,000 cfs prior to and after the HFE
- Lake elevation is projected to decrease by approximately 7 inches during the 3-day experiment
Costs
- Estimated costs to hydropower: TBD
- Actual costs to hydropower: TBD
- Direct expenses for removal of concession assets: TBD
COMPLIANCE
- Interior Initiates High-Flow Experiment at Glen Canyon Dam
- Media Advisory: High-Flow Experiment at Glen Canyon Dam
CONCERNS
ADDITIONAL
- AZ Central news article: Controlled flood of the Grand Canyon begins a four-day exercise on the Colorado River
- Lighted bypass tube video
- Colorado River Pearce Ferry Rapid After High Flow Release From Glen Canyon Dam