GCDAMP- HFE 2012

From Glen Canyon Dam AMP
Revision as of 09:15, 28 October 2013 by Jthiriot (Talk | contribs) (add 2012 sand transport)

Jump to: navigation, search
High Flow Experiment- 2012
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY: ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

SAND TRANSPORT caused by 2012 HFE

  • @ RM30 = 390,000 metric tons
  • @ RM60 = 380,000 metric tons
  • @ RM87 = 540,000 metric tons
  • @ RM225 = 970,000 metric tons


TBD





Contributor: Category: Sediment, Recreation, Water delivery