GCDAMP- HFE 2012
From Glen Canyon Dam AMP
High Flow Experiment- 2012 | |
- HFE DETAILS -SUMMARY: ---DRAFT---- THIS PAGE IS UNDER CONSTRUCTION
SUPPORTING DOCUMENTS
- 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment
- 131022 Fall 2013 HFE Protocol Decision Process
- 131022 2013 HFE Locations and dates of hydrograph routing
- 131022 System Overview to Basin States- USGS Schmidt
- 131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi
COMPLIANCE
- A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
- DOI consultation meeting with the Basin States_ October 22, 2013
SAND TRANSPORT caused by 2012 HFE
- @ RM30 = 390,000 metric tons
- @ RM60 = 380,000 metric tons
- @ RM87 = 540,000 metric tons
- @ RM225 = 970,000 metric tons
TBD
- CRC 0020.JPG
Contributor: Category: Sediment, Recreation, Water delivery