Trout Reduction Efforts

From Glen Canyon Dam AMP
Revision as of 13:59, 28 April 2017 by Cellsworth (Talk | contribs)

Jump to: navigation, search




--
--
--

Updates

TroutFlows.jpg
TroutRemoval.jpg

Links and Information

Projects

  • Bright Angel Creek Non-Native Trout Reduction Project
  • Brown trout control at the mouth of Bright Angel Creek
  • Mainstem trout removal at the LCR
  • Trout Management Flows

Presentations and Papers

2017

2016

2015

2013

LTEMP BiOp Triggers for Trout Removals at the LCR (LTEMP BA Appendix D)

Tier 1 Trigger – Early Intervention Through Conservation Actions:

  • 1a. If the combined point estimate for adult HBC (adults defined ≥200 mm) in the Colorado River mainstem LCR aggregation; RM 57-65.9) and Little Colorado River (LCR) falls below 9,000 as estimated by the currently accepted HBC population model (e.g., ASMR, multi-state).

-OR-

  • 1b. If recruitment of sub-adult HBC (150-199mm) does not equal or exceed estimated adult mortality such that:
  1. Sub-adult abundance falls below a three-year running average of 1,250 fish in the spring LCR population estimates, or
  2. Sub-adult abundance falls below a three-year running average of 810 fish in the mainstem Juvenile Chub Monitoring reach (JCM annual fall population estimate; RM 63.45-65.2).

Tier 1 Trigger Response:

  • Tier 1 conservation actions listed below will be immediately implemented either in the LCR or in the adjacent mainstem. Conservation actions will focus on increasing growth, survival and distribution of HBC in the LCR & LCR mainstem aggregation area.

Tier 2 Trigger - Reduce threat using mechanical removal if conservation actions in Tier 1 are insufficient to arrest a population decline:

Mechanical removal of nonnative aquatic predator will ensue:

  • If the point abundance estimate of adult HBC decline to <7,000, as estimated by the currently accepted HBC population model.

Mechanical removal will terminate if:

  • Predator index (described below) is depleted to less than 60 RBT/km for at least two years in the JCM reach and immigration rate is low (the long term feasibility of using immigration rates as a metric still needs to be assessed),

-OR-

  • Adult HBC population estimates exceed 7,500 and recruitment of sub-adult chub exceed adult mortality for at least two years.
PredatorIndexTable.jpg

If immigration rate of predators into JCM reach is high, mechanical removal may need to continue. These triggers are intended to be adaptive based on ongoing and future research (e.g., Lees Ferry recruitment and emigration dynamics, effects of trout suppression flows, effects of Paria River turbidity inputs on predator survival and immigration rates, interactions between humpback chub and rainbow trout, other predation studies).

Other Stuff