The 2019 Fall HFE
From Glen Canyon Dam AMP
Revision as of 15:02, 1 July 2020 by Cellsworth (Talk | contribs)
High Flow Experiment- 2017 | |
Contents
2019 High Flow Experiment Snapshot
- The 2019 HFE was not conducted for lack of adequate sediment input from the Paria River
Sediment Conditions
Fall Accounting Period
- Paria input (Jul 1 - Nov 30): 52,711
- Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) = -190,000
- Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) = -150,000
- Available for HFE: -190,000 + -150,000 = -40,000
Winter Accounting Period
- Paria input (Dec 1 to Apr 1): 50,737
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for spring HFE: