GCDAMP- HFE 2013
From Glen Canyon Dam AMP
High Flow Experiment- 2013 | |
- HFE DETAILS -SUMMARY:
Contents
SUPPORTING DOCUMENTS
- 131022 Fall 2013 HFE Protocol Decision Process
- 131022 2013 HFE Locations and dates of hydrograph routing
- 131022 System Overview to Basin States- USGS Schmidt
- 131022 USGS Science Overview- Fisheries and Aquatic Ecology to Basin States- SVanderkooi
COMPLIANCE
- A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
- DOI consultation meeting with the Basin States_ October 22, 2013
TBD
TBD
- CRC 0011.JPG
- CRC 0012.JPG
- CRC 0013.JPG
- CRC 0014.JPG
- CRC 0015.JPG
- CRC 0016.JPG
- CRC 0017.JPG
- CRC 0018.JPG
- CRC 0019.JPG
- CRC 0020.JPG
Contributor: Category: Sediment, Recreation, Water delivery