GCDAMP- HFE 2013

From Glen Canyon Dam AMP
Revision as of 09:27, 28 October 2013 by Jthiriot (Talk | contribs) (add 131025 Final HFE Memo to Larry Walkoviak 10-25-13 with attachment.PDF)

Jump to: navigation, search
High Flow Experiment- 2013
CRC 121119 0038.JPG
  • HFE DETAILS -SUMMARY:

SUPPORTING DOCUMENTS

COMPLIANCE

  • A 30-day letter was sent notifying MOA signatories of a possible HFE in November 2013.
  • DOI consultation meeting with the Basin States_ October 22, 2013

TBD

TBD





Contributor: Category: Sediment, Recreation, Water delivery