GCDAMP Sediment

From Glen Canyon Dam AMP
Revision as of 12:15, 7 January 2016 by Cellsworth (Talk | contribs)

Jump to: navigation, search

250px‎

  • Sediment Goal 7 of the DFC's- Maintain or attain levels of sediment storage within the main channel and along shorelines to achieve ecosystem goals.
  • Sediment Goal 8 of the Strategic Plan- Maintain or attain levels of sediment storage within the main channel and along shorelines to achieve the AMP ecosystem goals.


TBD
(Motions)
TBD
(TBD)
TBD

GROUP MEMBERS

  • TWG Sediment Ad-Hoc Group formed November 8, 2001

News


  • GRAPH- Average Sand Inputs- by Month- USGS 082011.jpg
  • GRAPH- Paria Inputss- by month and year- NPS 120201.jpg
  • Strong turbidity gradient Slide 15.jpg
  • Particle Sizes- PIC.jpg






Information

Reports and Links

2015

2014

Other Stuff