Operations of Glen Canyon Dam

The operating tier for water year 2017, established in August 2016, is the Upper Elevation Balancing Tier, with an initial water year release volume of 8.23 maf and the potential for an April 2017 adjustment to equalization or balancing releases. Based on the current forecast, an April adjustment to balancing releases is projected to occur and Lake Powell is currently projected to release 9.0 maf in water year 2017. This projection will be updated each month throughout the water year. [1]

--- --- ---

Updates

2017MonthlyVolumes.jpg [2]

USBR Monthly/Annual Reports

Report to Congress Regarding Operations of Glen Canyon Dam


Links and Information

Presentations and Papers

2017

2016

2015

2014

2013

Operational Flexibility

In addition to daily scheduled fluctuations for power generation, the instantaneous releases from Glen Canyon Dam may also fluctuate to provide 40 megawatts (mw) of system regulation. These instantaneous release adjustments stabilize the electrical generation and transmission system and translate to a range of about 1,200 cfs above or below the hourly scheduled release rate. Under system normal conditions, fluctuations for regulation are typically short lived and generally balance out over the hour with minimal or no noticeable impacts on downstream river flow conditions.

Releases from Glen Canyon Dam can also fluctuate beyond scheduled releases when called upon to respond to unscheduled power outages or power system emergencies. Depending on the severity of the system emergency, the response from Glen Canyon Dam can be significant, within the full range of the operating capacity of the power plant for as long as is necessary to maintain balance in the transmission system. Glen Canyon Dam typically maintains 30 mw (approximately 880 cfs) of generation capacity in reserve in order to respond to a system emergency even when generation rates are already high. System emergencies occur fairly infrequently and typically require small responses from Glen Canyon Dam. However, these responses can have a noticeable impact on the river downstream of Glen Canyon Dam. [3]

Other Stuff

Video of the construction of Glen Canyon Dam

1983 flood videos and spillway repairs

What is the total release (CFS) possible from Glen Canyon Dam?

  • Total release during a HFE = Power plant capacity + 15,000 cfs through the bypass tubes
  • Capacity depends on how many of the 8 units are available. [4]