High Flow Experiment- 2017
CRC 121119 0038.JPG

2017 High Flow Experiment Snapshot

  • The 2017 HFE was not conducted for lack of adequate sediment input from the Paria River

Sediment Conditions

Fall Accounting Period

  • Paria input (Jul 1 - Nov 30): 274,000
  • Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) = 2,000
  • Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) = 2,000
  • Available for HFE: 2,000 + 2,000 = 4,000

Winter Accounting Period

  • Paria input (Dec 1 to Apr 1): 17,000
  • Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) = -187,000
  • Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) = -16,000
  • Available for spring HFE: 17,000 - 187,000 -16,000 = -186,000