The 2018 Fall HFE
From Glen Canyon Dam AMP
Revision as of 14:55, 24 September 2018 by Cellsworth (Talk | contribs) (Created page with " {{Infobox Person |name = High Flow Experiment- 2018 |image = CRC 121119 0038.JPG |alma_mater = |Job Title = November 7-11 |Previous_Title_ = |Previ...")
High Flow Experiment- 2018 | |
Contents
2018 High Flow Experiment Snapshot
Sediment Conditions
Fall Accounting Period
- Paria input (Jul 1 - Sept 21): 709,000
- Accumulated in Upper Marble Canyon (Jul 1 - Sept 4, lower bound) = 238,000
- Accumulated in Lower Marble Canyon (Jul 1 - Sept 4, lower bound) = 84,000
- Available for HFE: 238,000 + 84,000 = 322,000
HFE Transport
- Paria input (Nov 5 - 10):
- Evacuated from Upper Marble Canyon (Nov 7 - 12, lower bound) =
- Evacuated from Lower Marble Canyon (Nov 7 - 12, lower bound) =
- Left over in Marble Canyon after HFE (Nov 7 - 12):
Winter Accounting Period
- Paria input (Nov 11 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for spring HFE: