The 2019 Fall HFE
From Glen Canyon Dam AMP
Revision as of 10:28, 19 December 2019 by Cellsworth (Talk | contribs) (Created page with " {{Infobox Person |name = High Flow Experiment- 2017 |image = CRC 121119 0038.JPG |alma_mater = |Job Title = November 7-11 |Previous_Title_ = |Previ...")
High Flow Experiment- 2017 | |
Contents
2019 High Flow Experiment Snapshot
- The 2019 HFE was not conducted for lack of adequate sediment input from the Paria River
Sediment Conditions
Fall Accounting Period
- Paria input (Jul 1 - Nov 30):
- Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) =
- Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) =
- Available for HFE:
Winter Accounting Period
- Paria input (Dec 1 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for spring HFE: