The 2019 Fall HFE

From Glen Canyon Dam AMP
Revision as of 10:33, 19 December 2019 by Cellsworth (Talk | contribs)

Jump to: navigation, search
High Flow Experiment- 2017
CRC 121119 0038.JPG

2019 High Flow Experiment Snapshot

  • The 2019 HFE was not conducted for lack of adequate sediment input from the Paria River

Sediment Conditions

Fall Accounting Period

  • Paria input (Jul 1 - Nov 30):
  • Accumulated in Upper Marble Canyon (Jul 1 - Nov 30, lower bound) =
  • Accumulated in Lower Marble Canyon (Jul 1 - Nov 30, lower bound) =
  • Available for HFE:

Winter Accounting Period

  • Paria input (Dec 1 to Apr 1):
  • Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
  • Available for spring HFE:

SUPPORTING DOCUMENTS

COMPLIANCE

CONCERNS

ADDITIONAL