2020 Spring High Flow Experiment Snapshot
- The 2020 Spring HFE was not conducted for lack of adequate sediment input from the Paria River
Sediment Conditions
Winter Accounting Period
- Paria input (Dec 1 to Apr 1):
- Evacuated from Upper Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Evacuated from Lower Marble Canyon (Dec 1 to Apr 1, lower bound) =
- Available for Spring HFE: