File:GSF sloughs HFE 11102016 KH.jpg
From Glen Canyon Dam AMP
Size of this preview: 450 × 600 pixels. Other resolutions: 180 × 240 pixels | 1,512 × 2,016 pixels.
Original file (1,512 × 2,016 pixels, file size: 608 KB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 06:37, 8 December 2016 | 1,512 × 2,016 (608 KB) | Cellsworth (Talk | contribs) | Here are the photos Ken took from the canyon rim on Nov 10, showing the GSF sloughs at the peak of the HFE (approx 38,000 cfs). on one photo I have indicated the division point between the Upper and Lower sloughs. We have estimated that the sloughs start flowing through at flows between 20,000 and 25,000 cfs. Photos taken with an automatic timer each hour during the HFE will give us a better idea of when the channel begins flowing, once the photos are processed. |
File usage
The following page links to this file: