Long-term Experimental and Management Plan (LTEMP)

From Glen Canyon Dam AMP
Revision as of 12:57, 19 October 2016 by Cellsworth (Talk | contribs)

Jump to: navigation, search


140927 50 Yr Power Generation 004.JPG

The Department of the Interior, through the Bureau of Reclamation (Reclamation) and the National Park Service (NPS), has prepared a draft environmental impact statement (DEIS) for the adoption of a long-term experimental and management plan (LTEMP) for the operation of Glen Canyon Dam. The DEIS fully evaluates the effects of dam operations on resources in Glen Canyon National Recreation Area, Grand Canyon National Park, and Lake Mead National Recreation Area, and provides the basis for decisions that identify management actions and experimental options that will provide a framework for adaptively managing Glen Canyon Dam over the next 20 years.

---
---
---

LTEMP website Long-term Experimental and Management Plan (LTEMP)

10/7/16

Today, the Department of the Interior (DOI) filed the LTEMP Final Environmental Impact Statement (FEIS) with the U.S. Environmental Protection Agency (EPA).

The FEIS is available to you for downloading at: http://ltempeis.anl.gov/documents/final-eis/

The LTEMP will determine specific options for dam operations (including hourly, daily, and monthly release patterns), non-flow actions, and appropriate experimental and management actions that will meet the requirements of the Grand Canyon Protection Act, maintain or improve hydropower production, and protect, mitigate adverse effects to, and improve downstream resources, including those of importance to American Indian Tribes.

DOI will not issue a final decision on the proposed action for a minimum of 30 days after the date that the EPA publishes its Notice of Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. After the 30-day public review period, the DOI will complete a Record of Decision (ROD). The ROD will state the action that will be implemented and discuss all factors leading to that decision.

The purpose of the proposed action is to provide a comprehensive framework for adaptively managing Glen Canyon Dam over the next 20 years consistent with the Grand Canyon Protection Act and other provisions of applicable Federal law. The proposed action will help determine specific dam operations and actions that could be implemented to improve conditions and continue to meet the Grand Canyon Protection Act’s requirements and to protect, mitigate adverse impacts to, and improve the downstream natural and cultural resources and visitor use in Glen Canyon National Recreation Area and Grand Canyon National Park, including resources of importance to American Indian Tribes. The need for the proposed action stems from the need to use scientific information developed since the 1996 ROD to better inform the public of Department of the Interior decisions on dam operations and other management and experimental actions so that the Secretary of the Interior may continue to meet statutory responsibilities for protecting downstream resources for future generations, conserving Endangered Species Act-listed species, avoiding or mitigating impacts on National Register of Historic Places-eligible properties, and protecting the interests of American Indian Tribes, while meeting obligations for water delivery and the generation of hydroelectric power.

For More Information

For more information about the Glen Canyon Dam LTEMP EIS, please see the project website (http://ltempeis.anl.gov/) or contact the respective joint-lead agency project managers, Dr. Katrina Grantz, Bureau of Reclamation, [email protected], 801-524-3712; or Mr. Rob Billerbeck, National Park Service, [email protected], 303-987-6789. Please forward this message to any party you feel may be interested in the LTEMP EIS.

Feedback

To submit feedback, contact the LTEMP EIS webmaster at [email protected]

Privacy Policy

Our online privacy policy is at: http://ltempeis.anl.gov/privacy/


Documents and Links

Papers and Presentations

2016

2014