Difference between revisions of "GCDAMP Glen Canyon Dam"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
(37 intermediate revisions by the same user not shown) | |||
Line 58: | Line 58: | ||
== '''Glen Canyon Monthly Operational Call''' == | == '''Glen Canyon Monthly Operational Call''' == | ||
− | *[[Media: | + | *[[Media:202404_Information.pdf| April 2024 Operations call]] |
− | + | *[[Media:202403_Information.pdf| March 2024 Operations call]] | |
− | + | *[[Media:202402_Information.pdf| February 2024 Operations call]] | |
− | + | *[[Media:202401_Information.pdf| January 2024 Operations call]] | |
− | + | *[[Media:202312_Information.pdf| December 2023 Operations call]] | |
− | + | *[[Media:202311_Information.pdf| November 2023 Operations call]] | |
− | + | *[[Media:102023_Information.pdf| October 2023 Operations call]] | |
− | + | *[[Media:September2023_Information.pdf| September 2023 Operations call]] | |
− | *[[Media: | + | *[[Media:August2023_Information.pdf| August 2023 Operations call]] |
− | *[[Media: | + | *[[Media:July2023_Information.pdf| July 2023 Operations call]] |
− | *[[Media: | + | *[[Media:June2023_Information.pdf| June 2023 Operations call]] |
− | *[[Media: | + | *[[Media:May2023_Information.pdf| May 2023 Operations call]] |
− | *[[Media: | + | |
− | *[[Media: | + | |
− | *[[Media: | + | [[Archived Glen Canyon Monthly Operations Call slides]] |
− | *[[Media: | + | |
− | *[[Media: | + | |
− | *[[Media: | + | |
− | *[[Media: | + | |
− | + | ||
− | + | ||
== '''USBR Monthly/Annual Reports''' == | == '''USBR Monthly/Annual Reports''' == | ||
Line 86: | Line 80: | ||
*[https://www.usbr.gov/uc/water/rsvrs/ops/aop/index.html Annual Operating Plans for Colorado River reservoirs] | *[https://www.usbr.gov/uc/water/rsvrs/ops/aop/index.html Annual Operating Plans for Colorado River reservoirs] | ||
− | == '''Report to Congress Regarding Operations of Glen Canyon Dam'''[https://www.usbr.gov/uc/ | + | == '''Report to Congress Regarding Operations of Glen Canyon Dam'''[https://www.usbr.gov/uc/DocLibrary/reports.html] == |
− | *[https://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2016-2017.pdf | + | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20210500-GlenCanyonDam-ReportCongress-2020-2021-508-UCRO.pdf Report to Congress - Water Year 2020-2021 ] |
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20210400-GlenCanyonDam-ReportCongress-2019-2020-508-UCRO.pdf Report to Congress - Water Year 2019-2020] | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20200600-GlenCanyonDam-ReportCongress-2018-2019-508-UCRO.pdf Report to Congress - Water Year 2018-2019] | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20180800-GlenCanyonDam-ReportCongress-2017-2018-508-UCRO.pdf Report to Congress - Water Year 2017-2018] | ||
+ | *[https://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2016-2017.pdf Report to Congress - Water Year 2016-2017 ] | ||
*[[Media:Years 2015-16 GC Report to Congress FINAL.pdf| 2015-2016 Report to Congress ]] | *[[Media:Years 2015-16 GC Report to Congress FINAL.pdf| 2015-2016 Report to Congress ]] | ||
− | *[ | + | *[https://www.usbr.gov/uc/DocLibrary/Reports/GlenCanyonDam/20150800-GlenCanyonDam-ReportCongress-2014-2015-508-UCRO.pdf 2014-2015 Report to Congress ] |
*[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2013-2014.pdf 2013-2014 Report to Congress ] | *[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2013-2014.pdf 2013-2014 Report to Congress ] | ||
*[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2010-2011.pdf 2010-2011 Report to Congress ] | *[http://www.usbr.gov/uc/envdocs/reports/GCDam/GC-Report-to-Congress2010-2011.pdf 2010-2011 Report to Congress ] | ||
Line 103: | Line 101: | ||
The Glen Canyon Power Operations Center operators utilize the generation schedule supplied by Western to operate the generating units while giving consideration to efficiency and equipment characteristics. In addition, the generators automatically respond to a “regulation signal” developed and electronically transmitted to the dam by Western for continuous response to power system load and frequency changes. (This is further described later in this paper). [https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | The Glen Canyon Power Operations Center operators utilize the generation schedule supplied by Western to operate the generating units while giving consideration to efficiency and equipment characteristics. In addition, the generators automatically respond to a “regulation signal” developed and electronically transmitted to the dam by Western for continuous response to power system load and frequency changes. (This is further described later in this paper). [https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
Line 139: | Line 128: | ||
It was the invocation of emergency exception criteria on April 1st, 1998 which piqued the interest of some AMWG members in Reclamation and Western’s interpretation of the ROD.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | It was the invocation of emergency exception criteria on April 1st, 1998 which piqued the interest of some AMWG members in Reclamation and Western’s interpretation of the ROD.[https://www.wapa.gov/regions/CRSP/PlanProject/Pages/glen-canyon-operations.aspx] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
Line 192: | Line 164: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | *[https://www.usbr.gov/uc/DocLibrary/Memos/20240326-EstablishmentInterimOperatingGuidanceGlenCanyonDamLowReservoirLevels-TechnicalDecisionMemo-508-TSC.pdf Glen Canyon Dam Interim Low Elevation Operational Guidance] | ||
*[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| 2017 Operating Criteria for Glen Canyon Dam]] | *[[Media:2017 Glen Canyon Operating Criteria Signed.pdf| 2017 Operating Criteria for Glen Canyon Dam]] | ||
*[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | *[http://ltempeis.anl.gov/documents/docs/LTEMP_ROD.pdf 2016 LTEMP Record of Decision (ROD)] | ||
Line 209: | Line 182: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | |||
+ | '''2023''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-11-08-twg-meeting/20231108-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2023-08-17-amwg-meeting/20230817-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-06-15-twg-meeting/20230615-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations, and Water Quality] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2023-04-13-twg-meeting/20230413-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2023-02-16-amwg-meeting/20230216-GlenCanyonDamOperationsUpperBasinHydrologyWaterQuality-508-UCRO.pdf Glen Canyon Dam Operations and Upper Basin Hydrology and Water Quality] | ||
+ | |||
+ | '''2022''' | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-10-13-twg-meeting/20221013-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-08-18-amwg-meeting/20220818-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-06-16-twg-meeting/20220616-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-05-18-amwg-meeting/20220518-BasinHydrologyOperations-508-UCRO.pdf Basin Hydrology and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-04-13-twg-meeting/20220413-BasinHydrologyOperationsWaterQuality-Presentation-508-UCRO.pdf Basin Hydrology, Operations, and Water Quality ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/amwg/2022-02-10-amwg-meeting/20220210-BasinHydrologyWaterQualityOperations-508-UCRO.pdf Basin Hydrology, Water Quality, and Operations ] | ||
+ | *[https://www.usbr.gov/uc/progact/amp/twg/2022-01-13-twg-meeting/20220113-TWGMeeting-BasinHydrologyOperationsWaterQuality-508-UCRO.pdf Basin Hydrology, Operations and Water Quality ] | ||
'''2021''' | '''2021''' |
Revision as of 16:21, 25 April 2024
|
Operations of Glen Canyon DamThe LTEMP Record of Decision (ROD) on the operation of Glen Canyon Dam was signed on December 15, 2016. It changed operations at Glen Canyon from the 1996 ROD that implemented the MLFF flow regime.
Maximum non-experimental flows:
Daily range:
Ramp rates:
|
Current Status |
Current Operations | Inflow Forecasts and Model Projections |
---|
|
|