Difference between revisions of "Interim Guidelines"
Cellsworth (Talk | contribs) |
Cellsworth (Talk | contribs) |
||
| (10 intermediate revisions by the same user not shown) | |||
| Line 25: | Line 25: | ||
|style="width:60%; font-size:120%;"| | |style="width:60%; font-size:120%;"| | ||
| − | + | ==2007 Interim Guidelines for Lower Basin Shortages== | |
| − | + | Several reservoir and water management decisional documents and agreements that govern the operation of Colorado River facilities and management of the Colorado River are scheduled to expire at the end of 2026. These include the 2007 Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead (2007 Interim Guidelines), the 2019 Drought Contingency Plans, as well as international agreements between the United States and Mexico pursuant to the United States-Mexico Treaty on Utilization of Waters of the Colorado and Tijuana Rivers and of the Rio Grande (1944 Water Treaty). | |
| − | + | The Post-2026 process will be a multi-year NEPA process that will identify a range of alternatives and determine operations for Lake Powell and Lake Mead and other water management actions for potentially decades into the future. Given the scope of the task, and the conditions facing the Colorado River Basin, the Department believes it is important to begin this process as soon as possible to provide ample time for a thorough, inclusive, and science-based decision-making process to be completed before the end of 2026. [https://www.usbr.gov/ColoradoRiverBasin/post2026/index.html] | |
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
| − | + | ||
|}<!-- | |}<!-- | ||
| Line 49: | Line 43: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
| − | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;"> 2007 Interim Guidelines </h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| Line 68: | Line 62: | ||
*subsequent to the public consultation meetings held in the summer of 2005, the Secretary has also determined the desirability of developing additional operational guidelines that will provide for releases greater than or less than 8.23 maf from Lake Powell; and | *subsequent to the public consultation meetings held in the summer of 2005, the Secretary has also determined the desirability of developing additional operational guidelines that will provide for releases greater than or less than 8.23 maf from Lake Powell; and | ||
*to further enhance this coordinated reservoir approach, the Secretary has also determined a need for guidelines that provide water users in the Lower Division states the opportunity to conserve, store, and take delivery of water in and from Lake Mead for the purposes of enhancing existing water supplies, particularly under low reservoir conditions. The Secretary has determined the need to modify and extend the ISG to coincide with the duration of the proposed new guidelines. This will provide an integrated approach for reservoir management and more predictability for future Lower Division water supplies. [https://www.usbr.gov/lc/region/programs/strategies/FEIS/Chp1.pdf] | *to further enhance this coordinated reservoir approach, the Secretary has also determined a need for guidelines that provide water users in the Lower Division states the opportunity to conserve, store, and take delivery of water in and from Lake Mead for the purposes of enhancing existing water supplies, particularly under low reservoir conditions. The Secretary has determined the need to modify and extend the ISG to coincide with the duration of the proposed new guidelines. This will provide an integrated approach for reservoir management and more predictability for future Lower Division water supplies. [https://www.usbr.gov/lc/region/programs/strategies/FEIS/Chp1.pdf] | ||
| + | |||
|} | |} | ||
| Line 82: | Line 77: | ||
*[https://www.usbr.gov/ColoradoRiverBasin/post2026/index.html Colorado River Post 2026 Operations - Reclamation page] | *[https://www.usbr.gov/ColoradoRiverBasin/post2026/index.html Colorado River Post 2026 Operations - Reclamation page] | ||
| + | *[https://www.usbr.gov/ColoradoRiverBasin/interimguidelines/index.html 2007 Interim Guidelines - Reclamation page] | ||
*[https://www.usbr.gov/ColoradoRiverBasin/interimguidelines/seis/index.html Supplemental Environmental Impact Statement for Near-term Colorado River Operations] | *[https://www.usbr.gov/ColoradoRiverBasin/interimguidelines/seis/index.html Supplemental Environmental Impact Statement for Near-term Colorado River Operations] | ||
| − | *[https://www. | + | *[https://gunnisonriverbasin.org/wp-content/uploads/2024/03/UDS-Alternative-Submittal-Letter-March-5-2024.pdf Upper Division States’ Alternative ] |
| + | *[https://www.azwater.gov/sites/default/files/2024-03/Lower%20Basin%20Alternative%20Letter%205.6.24.pdf Lower Division States’ Alternative] | ||
|- | |- | ||
| Line 97: | Line 94: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
| + | *[https://www.usbr.gov/uc/progact/amp/amwg/2024-08-22-amwg-meeting/20240822-Post-2026NEPAProcessStatusUpdate-508-AMWQD.pdf Post-2026 NEPA Process: Status Update ] | ||
| + | *[https://www.usbr.gov/uc/progact/amp/twg/2024-04-11-twg-meeting/20240411-BiologicalOpinionNear-termColoradoRiverOperationsFinalSEISGlenCanyonDamOperations-508-AMWD.pdf Biological Opinion for the Near-term Colorado River Operations Final Supplemental EIS: Glen Canyon Dam Operations ] | ||
*[https://www.federalregister.gov/documents/2023/06/16/2023-12923/notice-of-intent-to-prepare-an-environmental-impact-statement-and-notice-to-solicit-comments-and Notice of Intent To Prepare an Environmental Impact Statement and Notice To Solicit Comments and Hold Public Scoping Meetings on the Development of Post-2026 Operational Guidelines and Strategies for Lake Powell and Lake Mead] | *[https://www.federalregister.gov/documents/2023/06/16/2023-12923/notice-of-intent-to-prepare-an-environmental-impact-statement-and-notice-to-solicit-comments-and Notice of Intent To Prepare an Environmental Impact Statement and Notice To Solicit Comments and Hold Public Scoping Meetings on the Development of Post-2026 Operational Guidelines and Strategies for Lake Powell and Lake Mead] | ||
|- | |- | ||
| − | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;"> | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3b0bf; text-align:left; color:#000; padding:0.2em 0.4em;">Supplemental Environmental Impact Statement for Near-term Colorado River Operations </h2> |
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
Latest revision as of 15:53, 21 August 2026
|
|
2007 Interim Guidelines for Lower Basin ShortagesSeveral reservoir and water management decisional documents and agreements that govern the operation of Colorado River facilities and management of the Colorado River are scheduled to expire at the end of 2026. These include the 2007 Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead (2007 Interim Guidelines), the 2019 Drought Contingency Plans, as well as international agreements between the United States and Mexico pursuant to the United States-Mexico Treaty on Utilization of Waters of the Colorado and Tijuana Rivers and of the Rio Grande (1944 Water Treaty). The Post-2026 process will be a multi-year NEPA process that will identify a range of alternatives and determine operations for Lake Powell and Lake Mead and other water management actions for potentially decades into the future. Given the scope of the task, and the conditions facing the Colorado River Basin, the Department believes it is important to begin this process as soon as possible to provide ample time for a thorough, inclusive, and science-based decision-making process to be completed before the end of 2026. [1] |
| -- |
-- |
-- |
|---|
|
|