File:HFE 2019 Report V3 tv qp.docx

From Glen Canyon Dam AMP
Jump to: navigation, search
HFE_2019_Report_V3_tv_qp.docx(file size: 340 KB, MIME type: application/x-opc+zip)
Warning: This file type may contain malicious code. By executing it, your system may be compromised.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current10:59, 16 September 2019 (340 KB)Cellsworth (Talk | contribs)Here is the report from ANL. They estimate that the 11/18 HFE cost $1.31 million. This report does NOT include an estimate of the cost of bug flows for FY 2019 – only the HFE. So, to be clear, constructed returns for FY 2019 is not final without the bug flow estimate.

The following page links to this file: