− | + | The '''Core Monitoring Plan''' describes a general plan and framework for the development of a core monitoring program | |
for the GCDAMP during federal fiscal years 2011 through 2015. Detailed core monitoring plans with | for the GCDAMP during federal fiscal years 2011 through 2015. Detailed core monitoring plans with | ||
explicit methodologies for each resource category will be developed as outlined in this plan over the next | explicit methodologies for each resource category will be developed as outlined in this plan over the next | ||
several years. The proposed process is consistent with the strategies and objectives described in the Grand | several years. The proposed process is consistent with the strategies and objectives described in the Grand | ||
− | Canyon Monitoring and Research Center’s (GCMRC) Strategic Science Plan (U.S. Geological Survey, | + | Canyon Monitoring and Research Center’s (GCMRC) [[Strategic Science Plan]] (U.S. Geological Survey, |
− | 2007a) and Monitoring and Research Plan (U.S. Geological Survey, 2007b), and the GCDAMP Strategic | + | 2007a) and [[Monitoring and Research Plan]] (U.S. Geological Survey, 2007b), and the GCDAMP Strategic |
Plan as amended by the Adaptive Management Work Group at their August 2003 meeting (AMWG | Plan as amended by the Adaptive Management Work Group at their August 2003 meeting (AMWG | ||
written comm., 2003, hereafter cited as GCDAMP, 2003). | written comm., 2003, hereafter cited as GCDAMP, 2003). | ||
Line 64: | Line 64: | ||
! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. | ! style="width=20%; background:#cedff2;" | [[GCDAMP Strategic Plan]] <br> The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. | ||
− | ! style="width=20%; background:#cedff2;" | [[Strategic Science Plan]] <br> The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next | + | ! style="width=20%; background:#cedff2;" | [[Strategic Science Plan]] <br> The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next five years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
! style="width=20%; background:#cedff2;" | [[Core Monitoring Plan]] <br> The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. | ! style="width=20%; background:#cedff2;" | [[Core Monitoring Plan]] <br> The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. | ||
− | ! style="width=20%; background:#cedff2;" | [[Monitoring and Research Plan]] <br> The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next | + | ! style="width=20%; background:#cedff2;" | [[Monitoring and Research Plan]] <br> The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next five years to address some of the strategic science questions associated with AMWG priority questions. |
− | ! style="width=20%; background:#cedff2;" | [[ | + | ! style="width=20%; background:#cedff2;" | [[GCDAMP Budget|Budget and Workplan]] <br> The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
|} | |} | ||
Line 77: | Line 77: | ||
|class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | |class="MainPageBG" style="width:55%; border:1px solid #cef2e0; background:#f5faff; vertical-align:top; color:#000;"| | ||
{|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | {|width="100%" cellpadding="2" cellspacing="5" style="vertical-align:top; background:#f5faff;" | ||
− | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">Monitoring | + | ! <h2 style="margin:0; background:#cedff2; font-size:120%; font-weight:bold; border:1px solid #a3bfb1; text-align:left; color:#000; padding:0.2em 0.4em;">[[Media:CoreMonitoringPlan 02-18-11 (1).pdf| Core Monitoring Plan]] |
+ | </h2> | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | + | == Chapter 1. Introduction to the Core Monitoring Plan == | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
+ | 1.1 Purpose and Scope of the General Core Monitoring Plan <br> | ||
+ | 1.2 Legislation, Statutes, Policy, and Strategic Planning <br> | ||
+ | 1.3 Boundary and Definition of the Colorado River Ecosystem <br> | ||
+ | 1.4 History of Monitoring the Colorado River Ecosystem below Glen Canyon Dam <br> | ||
+ | 1.4.2 Glen Canyon Environmental Studies Era (1982–96) <br> | ||
+ | 1.4.3 GCMRC Era (1997–present) <br> | ||
+ | |||
+ | ==Chapter 2. GCDAMP Monitoring Needs== | ||
+ | |||
+ | 2.1 Monitoring within the Glen Canyon Dam Adaptive Management Program Strategic Plan Framework <br> | ||
+ | 2.2 Core Monitoring Information Needs and Indicators of Resource Condition <br> | ||
+ | 2.3 Relationship between Monitoring and Modeling <br> | ||
+ | 2.4 Integration of Monitoring and Management Activities across GCDAMP Programs <br> | ||
+ | 2.5 Integration with Other Monitoring Programs in the Region <br> | ||
+ | |||
+ | ==Chapter 3. Development of Individual Core Monitoring Plans and Management Strategy to Support Them== | ||
+ | |||
+ | 3.1 Process to Develop Individual Core Monitoring Plans <br> | ||
+ | 3.1.1 Information Needs Workshop <br> | ||
+ | 3.1.2 Scientific Protocol Evaluation Panel Reviews <br> | ||
+ | 3.1.3 Step 4: Core Monitoring Program Reports/Individual Core Monitoring Plans <br> | ||
+ | 3.1.4 Principles of Individual Core Monitoring Plan Development <br> | ||
+ | 3.1.4.1 Goals and CMINs <br> | ||
+ | 3.1.4.2 Criteria <br> | ||
+ | 3.1.4.3 Trade Off Analyses for Risk Assessment Purposes <br> | ||
+ | 3.2. Implementation of Core Monitoring Plans <br> | ||
+ | 3.2.1 Implementation Timelines <br> | ||
+ | 3.2.2 Implementation of Individual Core Monitoring Programs <br> | ||
+ | 3.2.3 Incorporating Future Technical Innovations into Monitoring Programs <br> | ||
+ | *Evaluation of noninvasive sampling methods as a basic component of maintaining quality monitoring programs | ||
+ | 3.3 Program Management and Role of Cooperators <br> | ||
+ | 3.3.1 GCMRC Staffing Requirements <br> | ||
+ | 3.3.2 Information Outreach <br> | ||
+ | 3.3.3 Logistics and Permitting <br> | ||
+ | 3.3.4 Core Monitoring Program Costs <br> | ||
+ | |||
+ | ==Chapter 4. Core Monitoring Proposals by GCDAMP Goal == | ||
+ | Summary Descriptions of Individual Core Monitoring Programs by GCDAMP Goals <br> | ||
+ | |||
+ | ==Goal 1: Protect or improve the aquatic food base so that it will support viable populations of desired species at higher trophic levels == | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Program Status and Implementation Schedule | ||
+ | |||
+ | ==Goal 2: Maintain or attain viable populations of existing native fish, remove jeopardy for humpback chub and razorback sucker, and prevent adverse modification to their critical habitats == | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Program Status and Implementation Schedule | ||
+ | |||
+ | ==Goal 3: Restore populations of extirpated species, as feasible and advisable== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Estimated Annual Funding for Extirpated Species Core Monitoring Program | ||
+ | |||
+ | ==Goal 4: Maintain a naturally reproducing population of rainbow trout above the Paria River, to the extent practicable and consistent with the maintenance of viable populations of native fish== | ||
+ | *Problem Statement | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Program | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | |||
+ | ==Goal 5: Maintain or attain viable populations of Kanab Ambersnail == | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Program Status and Implementation Schedule | ||
+ | |||
+ | ==Goal 6: Protect or improve the biotic riparian and spring communities, including threatened and endangered species and their critical habitat== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Riparian Vegetation | ||
+ | *Arthropods and Birds | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Program Status and Implementation Schedule | ||
+ | |||
+ | ==Goal 7: Establish water temperature, quality, and flow dynamics to achieve the GCDAMP ecosystem goals == | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Lake Powell | ||
+ | *Colorado River Downstream from Lake Powell | ||
+ | *Summary of Monitoring Project | ||
+ | *Lake Powell | ||
+ | *Colorado River Downstream from Lake Powell | ||
+ | |||
+ | ==Goal 8: Maintain or attain levels of sediment storage within the main channel and along shorelines to achieve the GCDAMP ecosystem goals == | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Monitoring in-channel sediment storage – SedTrend | ||
+ | *Monitoring High-Elevation Sandbar Deposits and Campsites | ||
+ | *Monitoring Changes in Coarse-Grained Sediments and Impacts from Tributary Debris Flows | ||
+ | |||
+ | ==Goal 9: Maintain or improve the quality of recreational experiences for users of the Colorado River ecosystem, within the framework of the GCDAMP ecosystem goals== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Monitoring Program Status/Implementation Schedule | ||
+ | |||
+ | ==Goal 10: Maintain power production capacity and energy generation, and increase where feasible and advisable, within the framework of the GCDAMP ecosystem goals== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Core Monitoring Information Needs Summary | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Program Status/Implementation Schedule | ||
+ | |||
+ | ==Goal 11: Preserve, protect, manage, and treat cultural resources for the inspiration and benefit of past, present, and future generations== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Links to Other Program Elements | ||
+ | *Core Monitoring Information Needs | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Geographic Scope | ||
+ | *Temporal Scope | ||
+ | *Methods | ||
+ | *Program Status/Implementation Schedule | ||
+ | |||
+ | ==Goal 12: Maintain a high-quality monitoring, research, and adaptive management program== | ||
+ | *Statement of Problem | ||
+ | *Parameters/Indicators to Be Monitored, Monitoring Signals, and Reporting Variables | ||
+ | *Vegetation | ||
+ | *Sandbars and Campsites | ||
+ | *Sediment Storage | ||
+ | *Shoreline Morphology | ||
+ | *Archaeological Sites | ||
+ | *Links to Resources | ||
+ | *Core Monitoring Information Needs Summary | ||
+ | *Summary of Previous Work | ||
+ | *Summary of Monitoring Project | ||
+ | *Four-band Digital Imagery | ||
+ | *Hyperspectral Digital Imagery | ||
+ | *Dual-laser Bathymetric/Terrestrial Lidar | ||
+ | *High-Resolution Terrestrial Lidar | ||
+ | |||
+ | ==Chapter 5. Data Management, Quality Assurance, and Reporting== | ||
+ | 5.1 Introduction <br> | ||
+ | 5.2 Data Management Overview – Roles and Responsibilities <br> | ||
+ | 5.3 Data Quality Assurance <br> | ||
+ | 5.4 Planning <br> | ||
+ | 5.5 Electronic Data Repository <br> | ||
+ | 5.6 Analysis and Modeling <br> | ||
+ | 5.7 Reporting of Core Monitoring Data, Annual Assessments & Synthesis <br> | ||
+ | |||
+ | ==Publication of Core Monitoring Data== | ||
+ | [[Knowledge Assessment|'''Annual Reporting Workshop''']] <br> | ||
+ | Annual Resources Fact Sheets on Status and Trends <br> | ||
+ | [http://www.riversimulator.org/Resources/USGS/SCOREreport1999Draft.pdf '''SCORE Reports''']<br> | ||
+ | |||
+ | ==References== | ||
+ | |||
+ | ==Appendices== | ||
+ | Appendix A: Core Monitoring Information Needs <br> | ||
+ | Appendix B: Description of the TWG Review and Approval Process for Individual Core Monitoring Plans <br> | ||
+ | Appendix C: Description of the Scientific Protocol Evaluation Panel (PEP) Review Process <br> | ||
+ | |||
+ | ==GLOSSARY== | ||
|} | |} | ||
Line 102: | Line 304: | ||
|style="color:#000;"| | |style="color:#000;"| | ||
− | *[[Media:CoreMonitoringPlan 02-18-11 (1).pdf| 2011 Core Monitoring Plan]] | + | *[[Media:CoreMonitoringPlan 02-18-11 (1).pdf| '''2011 Core Monitoring Plan''']] |
*[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | *[[Portal:Desired Future Conditions -DFCs| 2012 Desired Future Conditions]] | ||
+ | *[http://www.riversimulator.org/Resources/USGS/SCOREreport1999Draft.pdf 1999 SCORE Report] | ||
+ | *[[Knowledge Assessment|Knowledge Assessments]] | ||
*[[PEP reviews]] | *[[PEP reviews]] | ||
+ | *Back to [[GCDAMP Planning]] | ||
|- | |- | ||
Line 113: | Line 318: | ||
*[[Media:2012 Core Research Questions.doc| 2012 Core Research Questions]] | *[[Media:2012 Core Research Questions.doc| 2012 Core Research Questions]] | ||
*[[Media:2005 Core Monitoring Information Needs.docx| 2005 Core Monitoring Information Needs]] | *[[Media:2005 Core Monitoring Information Needs.docx| 2005 Core Monitoring Information Needs]] | ||
− | + | *[[Media:2004 GCDAMP Goals&PriorityQuestions.docx| 2004 GCDAMP Goals and AMWG Priority Questions]] | |
− | + | ||
− | + | ||
− | *[[Media:2004 GCDAMP Goals&PriorityQuestions.docx| 2004 GCDAMP Goals | + | |
− | + | ||
− | + | ||
|- | |- | ||
Line 124: | Line 324: | ||
|- | |- | ||
|style="color:#000;"| | |style="color:#000;"| | ||
+ | |||
+ | '''2011''' | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11mar08/Attach_09c.pdf Review of TWG Developed Appendix and Related Changes to the GCMRC Draft Core Monitoring Plan] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11mar08/Attach_10a.pdf Appendix B, TWG Review and Approval of Individual Core Monitoring Plans] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11mar08/Attach_10b.pdf General Core Monitoring Plan Dated February 18, 2011] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11mar08/Attach_10c.pdf General Core Monitoring Plan Criteria Development PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11mar08/Attach_10d.pdf General Core Monitoring - Structured Decision Making Process handout] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11jan20/index.html Monitoring Plan: Final Steps PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11jan20/Attach_06b.pdf Chapter 1. Introduction to the Core Monitoring Plan] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/11jan20/index.html 3.3.4 Core Monitoring Program Costs] | ||
+ | |||
+ | '''2010''' | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_05a.pdf General Core Monitoring Plan with Edits by Shane Capron] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_05b.pdf Appendix B, TWG Review of Individual Core Monitoring Plans] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_05c.pdf General Core Monitoring Plan TWG Comments/GCMRC Response Table] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10nov15/Attach_05d.pdf Review of TWG developed Appendix and Related Changes to the GCMRC Draft Core Monitoring Plan] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jun29/Attach_06a.pdf E-mail message to the TWG dated June 24, 2010, transmitting the General Core Monitoring Plan for the Glen Canyon Dam Adaptive Management Work Group; Attachment 6b: Core Monitoring Plan: Next Steps PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_02a.pdf Revised General Core Monitoring Plan (by Shane Capron)] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_02b.pdf General Core Monitoring Plan for the GCD-AMP PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_02c.pdf Core Monitoring Plan TWG Workshop Results] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10mar15/Attach_02d.pdf Core Monitoring Plan: Next Steps PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_14a.pdf AIF: General Core Monitoring Plan Workshop Results and PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/10feb03/Attach_14b.pdf TWG Chair Report-General Core Monitoring Plan Workshop Results PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/10jan21/Attach_06.pdf General Core Monitoring Plan TWG Workshop Results] | ||
+ | |||
+ | '''2009''' | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_02.pdf General Core Monitoring Plan List of Major TWG Issues to Begin Consideration] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_03.pdf General Core Monitoring Plan Issues] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_04.pdf General Core Monitoring Plan TWG Comments and Suggestions PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_05.pdf General Core Monitoring Plan for the GCD-AMP PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_06.pdf Review of the General Core Monitoring Plan for the GCDAMP by the Science Advisors PPT] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09dec01/Attach_07.pdf General Core Monitoring Plan, December 1, 2009 TWG Workshop Results] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/twg/mtgs/09sep29/Attach_11b.pdf Upcoming Workshops: General Core Monitoring and Socioeconomic Program Workshop] | ||
+ | *[https://www.usbr.gov/uc/rm/amp/amwg/mtgs/09aug12/Attach_05g.pdf Update on the General Core Monitoring Plan for the GCD AMP PPT] | ||
|- | |- |
Latest revision as of 08:48, 10 July 2018
|
The Core Monitoring Plan describes a general plan and framework for the development of a core monitoring program for the GCDAMP during federal fiscal years 2011 through 2015. Detailed core monitoring plans with explicit methodologies for each resource category will be developed as outlined in this plan over the next several years. The proposed process is consistent with the strategies and objectives described in the Grand Canyon Monitoring and Research Center’s (GCMRC) Strategic Science Plan (U.S. Geological Survey, 2007a) and Monitoring and Research Plan (U.S. Geological Survey, 2007b), and the GCDAMP Strategic Plan as amended by the Adaptive Management Work Group at their August 2003 meeting (AMWG written comm., 2003, hereafter cited as GCDAMP, 2003). Monitoring is a fundamental requirement of the adaptive management process (Walters, 1986; Walters and Holling, 1990). The Department of the Interior (DOI) Adaptive Management Technical Guide (Williams and others, 2007) identifies four primary purposes for monitoring within an adaptive management program:
In 1995, the Grand Canyon Monitoring and Research Center (GCMRC) was created to fulfill the mandate in the 1992 Grand Canyon Protection Act for the establishment and implementation of a long-term monitoring and research program to ensure that Glen Canyon Dam is operated in a manner that protects the values for which the Grand Canyon National Park and the Glen Canyon National Recreation Area were created. Since its inception, many of the GCMRC activities have focused on continuing certain monitoring tasks previously established under the Glen Canyon Environmental Studies program (termed here as “Legacy” monitoring), conducting field experiments, and developing technologies in support of development of a core monitoring program. Implementation of a long-term core monitoring program will require a significant commitment of qualified personnel to ensure that the program is implemented in a sustainable and timely manner. With a few exceptions, much of the data collection is proposed to be performed by cooperating agencies and contractors as discussed below; however, some monitoring, such as quality of water and sediment monitoring that has historically been part of the USGS mission, is proposed to continue internal to the GCMRC and the Water Resources Discipline within USGS. |
GCDAMP Strategic Plan The GCDAMP Strategic Plan (AMPSP) is a long-term plan drafted in August 2001 by GCDAMP and GCMRC participants that identifies the AMWG’s vision, mission, principles, goals, management objectives, information needs, and management actions. |
Strategic Science Plan The GCMRC Strategic Science Plan (SSP) identifies general strategies for the next five years to provide science information responsive to the goals, management objectives, and priority questions as described in the AMPSP and other planning direction approved by the AMWG. |
Core Monitoring Plan The GCMRC Core Monitoring Plan (CMP) describes the consistent, long-term, repeated measurements using scientifically accepted protocols to measure status and trends of key resources to answer specific questions. Core monitoring is implemented on a fixed schedule regardless of budget or other circumstances (for example, water year, experimental flows, temperature control, stocking strategy, nonnative control, etc.) affecting target resources. |
Monitoring and Research Plan The GCMRC Monitoring and Research Plan (MRP) specifies (1) core monitoring activities, (2) research and development activities, and (3) long-term experimental activities consistent with the strategies and priorities established in this SSP to be conducted over the next five years to address some of the strategic science questions associated with AMWG priority questions. |
Budget and Workplan The GCMRC Triennial Work Plan (TWP) identifies the scope, objectives, and budget for monitoring and research activities planned for a 3-year period. When completed, the triennial work plan will be consistent with the MRP. |
---|
|